Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally.
Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Air coat plus
Next

Air coat plus

FOB Price

Get Latest Price

|

1000 Kilogram Minimum Order

Country:

South Korea

Model No:

-

FOB Price:

Get Latest Price

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

1000 Kilogram

Packaging Detail:

standard exort

Delivery Time:

20days with contract

Supplying Ability:

100 Ton per Month

Payment Type:

T/T, L/C

Product Group :

-

Contact Now

EZEN Global

South Korea

Free Member

Contact Person Mr. hyoung sik

123,dongil-ro seong dong-gu, Seoul, seoul

Contact Now

Product Specification

Product Description

Air coat plus
- Minerals elastic slurry repellent coating
Air coat plus is a product that is composed of mineral powder copolymer emulsion as inorganic composite elastic repellent. Air coat mini has a very excellent crack resistance to architecture, civil engineering structures and is the perfect product to the job site where
the elastic waterproofing membrane is required to products with durability and excellent adhesion and elasticity during the waterproofing and protection of concrete surface.
Features
● Excellent effect of preventing cracks
● Excellent resistance to akali and salt
● No lifting phenomenon and Excellent breathability
● Easy to maintain
● Excellent bonding with the concrete matrix
● Construction is possible, even wet surfaces
Application
● Rooftop
● Walking around veranda and balcony
● Cracking joints, concrete repair and coating
● Various construction and civil engineering structures Basement Waterproofing
● Parking, swimming pool, water treatment plant, sewage treatment plants, etc.
 
Construction / Surface Treatment
① If the crack is 0.3mm or more before construction, knead air coating plus to repair the place V-cutted
② Other possible irregularities on part of the surface grind with a hand grinder or grinding
③ completely remove dirt, grease, laitance, and other foreign material of the paint on surface of the construction
④ After treatment with water to remove surface dust
⑤ Sites that have been applied by urethane or epoxy, to remove the part of the lifting
⑥ If there is no lifting site that has been applied to the epoxy, always remove the scratch on surface.
Construction / coating work
① Apply the Air plus primer coat evenly on the construction site with a brush or roller
② After the operation is completed, by mixing the powder and liquid air coated mini, and the primary coating
③ Secondary coating is applied after completion of the primary drying of the surface state of the primary coating and then applied
to the direction of displacement
④ Summer season curing time according to a temperature change, there may be some differences
⑤ After construction is complete, in order to avoid physical damage to the passage that shall be prohibited. (*4 hours)
Construction and maintenance
① Ventilate the room well when working with the dry curing
② Swelling phenomenon occurs after curing has a suitable area to cut and repair
Notes
● Temperature is less than 3 ℃, *0 ℃ and above, to avoid construction
● If adhere to your skin, wash thoroughly with soap and water
● Please keep out of reach of children
● Do not freeze during the winter storage
● Compliance with prescribed mixing ratio, and use it *0 minutes after the formulation
● If the rain is expected within 6 hours, construction is prohibited.
 

Country: South Korea
Model No: -
FOB Price: Get Latest Price
Place of Origin: -
Price for Minimum Order: -
Minimum Order Quantity: 1000 Kilogram
Packaging Detail: standard exort
Delivery Time: 20days with contract
Supplying Ability: 100 Ton per Month
Payment Type: T/T, L/C
Product Group : -

Send a direct inquiry to this supplier

To:

Mr. hyoung sik < EZEN Global >

I want to know: