FOB Price
Get Latest Price6 ~ 787 / Set
|5 Set Minimum Order
Country:
China
Model No:
50-2000tpd
FOB Price:
6 ~ 787 / Set Get Latest Price
Place of Origin:
-
Price for Minimum Order:
6 per Set
Minimum Order Quantity:
5 Set
Packaging Detail:
wood box
Delivery Time:
1 month
Supplying Ability:
4 Set per Week
Payment Type:
-
Product Group :
Contact Person mill2-jasminejuan
No.33 Shenxia Road, Malu Industrial Park, Jiading District, Shanghai
Cement Grinding Station
Clinker grinding plant is a straight forward process. The clinker is transported to feed hopper, which feeds it into the Pre-crusher, Table feeders extract it out form the pre-crusher and feed it into a Ball mill, Blending of this fine powder with gypsum and other additives makes it the portland cement, Packing Plant and Material Handling equipment completes the offers.
Clinker Grinding Plant Requires Following Raw Materials : Clinker, Gypsum, Additives
The features of Cement Clinker Grinding plants: Economical, Less Power consumption, High Performance, Minimum Maintenance, Low cost of Production, Robust construction.
Clinker and Gypsum are carried from stock yards and dumps into a dump hopper. A Vibrating feeder controls feed rate. The Granulator which is feed by means of a belt conveyor Crushes, and then stores into the respective Silos/Hoppers by means of a Bucket elevator. The table feeder than feeds the crushed material in the desired proportion to the Ball Mill hopper.
The mix is intermediately stored to the Ball mill hopper by a Bucket Elevator. A mill feeder is installed to control the feed rate to mill, and adjust the desired fineness. The ball mill grinds the mixture which can now be called Portland cement. The Cement thus produced is stored into the Cement Silos. To ensure homogenized and consistent quality of cement, the same is blended through the aeration assemblies.
The Screw Feeders extract and transport the Cement to the Packing Plant where a preliminary screening removes any foreign/unwanted particle and than stores it into a hopper where it is packed with the help of Auto Packaging plants.
Country: | China |
Model No: | 50-2000tpd |
FOB Price: | 6 ~ 787 / Set Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 6 per Set |
Minimum Order Quantity: | 5 Set |
Packaging Detail: | wood box |
Delivery Time: | 1 month |
Supplying Ability: | 4 Set per Week |
Payment Type: | - |
Product Group : | Complete Set of Cement Machinery |