Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally.
Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
wear resistance UHMWPE pipe
Next

wear resistance UHMWPE pipe

FOB Price

Get Latest Price

8 ~ 100 / Meter

|

100 Meter Minimum Order

Country:

China

Model No:

DN85-600MM

FOB Price:

8 ~ 100 / Meter Get Latest Price

Place of Origin:

Heibei, China

Price for Minimum Order:

8 per Meter

Minimum Order Quantity:

100 Meter

Packaging Detail:

according to your requirment

Delivery Time:

20 days

Supplying Ability:

3600 Meter per Month

Payment Type:

-

Product Group :

-

Contact Now
Free Member

Contact Person Melody

Cangzhou, Hebei

Contact Now

Product Description


wear resistance UHMWPE pipe

Application advantages of UHMWPE pipes

1. advantage of UHMWPE pipe in fluctuated and easy 
subsidence ares

UHMWPE pipes is flexible and can be easily placed 
along with terrain of pipe ditch. It is widely 
used in water projects in subsidence zone, hilly 
area, desert, and earthquake-prone areas, solving problems of poor adaptability,
 being easily damaged by subsidence of earth, 
weak aseismatic ability for PCCP pipes, steel pipe,
 FRP pipes.

2. Advantage of UHMWPE pipe in non-excavation water supply and drainage projects in 
urban areas

When placing traditional pipelines of PCCP, steel, 
FRP, we have to damage roads, plants and buildings 
while there is no need to excavate for installation
 of UHMWPE pipelines but for small tunneling 
machine to pull and place it. The length of pipeline 
placed at one time can reach ***0m.

3. Advantage of UHMWPE pipes in water projects in 
narrow area

UHMWPE pipe is light in weight and flexible. 
It can pass by the obstacles within the range 
of its bend radius. There is lower area 
compensation, and smaller excavation area, no 
need of large scale lifting machine, base and 
sand filling when placing the UHMWPE pipeline, 
only to push the connected pipeline into the pipe 
ditch, fill the earth in and compact it.

Country: China
Model No: DN85-600MM
FOB Price: 8 ~ 100 / Meter Get Latest Price
Place of Origin: Heibei, China
Price for Minimum Order: 8 per Meter
Minimum Order Quantity: 100 Meter
Packaging Detail: according to your requirment
Delivery Time: 20 days
Supplying Ability: 3600 Meter per Month
Payment Type: -
Product Group : -

Send a direct inquiry to this supplier

To:

Melody < Cangzhou Boyang Pipeline Equipment Manufacturer Co., Ltd >

I want to know: