FOB Price
Get Latest Price8000 / Set
|1 Set Minimum Order
Country:
China
Model No:
Model150x150x2, Model180x240x2, Model200x220x2, Model220x270x2
FOB Price:
8000 / Set Get Latest Price
Place of Origin:
China
Price for Minimum Order:
8000 per Set
Minimum Order Quantity:
1 Set
Packaging Detail:
Plastic film for large parts and wooden case for small parts
Delivery Time:
7-10 days
Supplying Ability:
100 Set per Month
Payment Type:
Money Gram, Western Union, T/T
Product Group :
Model | HoleQty/hole diameter | Speed | Motor power | Remark |
---|---|---|---|---|
150x150x2 | 2*¢30(mm) | 1.21.4(m/min) | 5.5(kw) | Matching 50mm slab |
180x240x2 | 2*¢30(mm) | 1.21.4(m/min) | 5.5(kw) | Matching 80mm slab |
200x220x2 | 2*¢42(mm) | 1.21.4(m/min) | 7.5(kw) | Matching 90mm slab |
220x270x2 | 2*¢42(mm) | 1.21.4(m/min) | 7.5(kw) | Matching 120mm slab |
Firstly, Concrete batching machine start sand stone cement
assignment proportion procedure ,
After that materials can go into mixer machine to complete
mixing.
Next, mixed materials will drop into feeding dumper from the mixer
discharge port.
After that, feeding dumper will transport the materials to concrete
beam production bed.
There, materials will be dumped into the hopper of concrete beam
machine.
After that, Cement beam machine will start to work along the
rail.
Finally,the cement can come out, also the cutting machine can do
cut 24 hour later.
Country: | China |
Model No: | Model150x150x2, Model180x240x2, Model200x220x2, Model220x270x2 |
FOB Price: | 8000 / Set Get Latest Price |
Place of Origin: | China |
Price for Minimum Order: | 8000 per Set |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | Plastic film for large parts and wooden case for small parts |
Delivery Time: | 7-10 days |
Supplying Ability: | 100 Set per Month |
Payment Type: | Money Gram, Western Union, T/T |
Product Group : | Precast equipment |