FOB Price
Get Latest Price|
1 Set Minimum Order
Country:
China
Model No:
-
FOB Price:
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
Standard packing
Delivery Time:
In 35 days after get your advance payment
Supplying Ability:
40 Set per Month
Payment Type:
-
Product Group :
-
Contact Person Yolanda
Qingdao, Shandong
Application: For various electric vehicles, motorcycle tire curing, except man operated tire loading and removal, the entire curing process is automatic controlled.
Structure Features: The
machine is of side frame structure, with two side boards harden
into one integral upper and down beams. The hot plate is placed
between the upper and lower beams. The whole machine is fixed
stable with small noise and small quantity of consumable parts.
Electrical parts used linkage, manual, single exchange system and
PLC control system, which is simple, safe and reliable.
Type |
YLL***0 |
YLL***0 |
YLL****0 |
Tyre Type |
wheelbarrow |
Motorcycle &bicycle |
Light truck |
Working layer |
4 |
4 |
4 |
O.D. of plate (mm) |
**0 |
**0 |
**0 |
Total pressure (KN) |
**0 |
**0 |
***0 |
Dia. of plunger (mm) |
**0 |
**0 |
**0 |
Steam working pressure (Mpa) |
0.**0.8 |
0.**0.8 |
0.**0.8 |
Electric control system |
PLC |
PLC |
PLC |
Overall dim.(LxWxH)(mm) |
***0x***0x***0 |
For FCL goods, we usually pack machines with stretched film and then load them to the container.
For LCL goods, we usually pack machines with polywood boxes first, and then they will be transported to QINGDAO PORT by truck.
Country: | China |
Model No: | - |
FOB Price: | Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | Standard packing |
Delivery Time: | In 35 days after get your advance payment |
Supplying Ability: | 40 Set per Month |
Payment Type: | - |
Product Group : | - |