FOB Price
Get Latest Price|
130 Set Minimum Order
Country:
China
Model No:
2M-SA02
FOB Price:
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
130 Set
Packaging Detail:
Cartons
Delivery Time:
15-20 days after receive the prepayment
Supplying Ability:
10000 Set per Month
Payment Type:
L/C, T/T
Product Group :
Contact Person Elizabeth
Room 939 Hengbaili Building,Baoding,China, Baoding, Hebei
Model NO.: | 2M-SA*2 |
---|---|
Scaffolding Part Type: | Scaffolding Props |
Lapping Form: | Full Scaffolding |
Framework: | Frame Combined Scaffolding |
Supporting Mode: | Floor Type Scaffolding |
Material: | Aluminum |
Erection Position: | Internal Scaffolding |
Type: | Mobile |
Move Method: | Horizontal mobile Scaffolding |
Structural Style: | Tower Scaffolding |
Export Markets: | Global |
Packing: | Cartons |
---|---|
Origin: | China |
HS Code: | *********0 |
1. **0 Lb. Load capacity
2. Aluminum construction
3. *0% lighter than steel
4. Assembled size: 6'L× 6'H× *9"
5. 1/2' plywood deck with steel frame
6. Weight *3 Lb.
7. With anodized finish
8. Can be easily set up and dismantled by 1 person
9. Great for indoor and outdoor jobs and projects
Country: | China |
Model No: | 2M-SA02 |
FOB Price: | Get Latest Price |
Place of Origin: | China |
Price for Minimum Order: | - |
Minimum Order Quantity: | 130 Set |
Packaging Detail: | Cartons |
Delivery Time: | 15-20 days after receive the prepayment |
Supplying Ability: | 10000 Set per Month |
Payment Type: | L/C, T/T |
Product Group : | Aluminium Scaffold |