FOB Price
Get Latest Price700 ~ 1000 / Ton ( Negotiable )
|10 Ton Minimum Order
Country:
China
Model No:
50Mn/60Mn/65Mn
FOB Price:
700 ~ 1000 / Ton ( Negotiable )Get Latest Price
Place of Origin:
Shandong China
Price for Minimum Order:
700 per Ton
Minimum Order Quantity:
10 Ton
Packaging Detail:
container bags/steel drums
Delivery Time:
within 20 days after 30% deposit
Supplying Ability:
2000 Ton per Month
Payment Type:
L/C, T/T
Product Group :
-
Contact Person Ms. Cathy
puji, Jinan, Shandong
forged steel grinding ball
1. Forged steel balls
Size: *0mm***0mm
Hardness: HRC****5
Chemical elements: C: 0.***0.*5; Si: 0.***0.*7; Mn: 0.**1.2; S
& P: 0.*4Max; Cr: 0.*5Max.
2. Forged steel balls (RCAB*1)
Size: *0mm***0mm
Hardness: HRC****5
Chemical elements: C: 0.**0.9, Si: 0.***1.*0, Mn: 0.***1.*5, P/S:
0.*4Max, V: 0.***0.*2
Packing:
1. Container Bags Steel Drums
HMZDX****0TECHNICAL DATE OF AUTOMATIC PRODUCTION-LINE FOR GRINDING STEEL BALL
DIAMETER (mm ) |
WEIGHT (kg) |
TIME (PIECE/MINYTE) |
OUTPUT PER DAY (TON/*0HOURS) |
OUTPUT PER MOUTH (TONS/MOUTH) |
ELECTRIC FURNACE POWER(k w) |
*5 |
0.**5 |
*0 |
*0 |
**2.5 |
**0 |
*0 |
0.**2 |
*0 |
*5.7 |
**2.5 |
**0 |
*0 |
0.**2 |
*0 |
*0.7 |
**8 |
**0 |
Nominal diameter(mm) |
Diameteical talerance(mm) |
Weight of single forging ball in average(g) |
Number of piece of one ton forging ball in average |
Surface hardness(HRC) |
iMPACT TIUGHNESS(j/cm2) |
dia*0 dia*5 dia*0 dia*0 dia*0 |
*2 *1 |
*2 *4 **0 **3 **3 |
****0 ****5 ***0 ***2 ***9 |
*0~*5 |
*2 |
dia*0 dia*0 dia*0 dia*0 dia**0 |
*3 *2 |
**8 ***0 ***4 ***6 ***0 |
***6 **9 **5 **3 **3 |
*0~*5 |
*2 |
dia**0 dia**0 dia**0 |
*4 *2 |
***7 ***2 ***0 |
**2 **0 **0 |
*5~*0 |
*2 |
dia**0 dia**0 |
*4 *3 |
****8 ****1 |
*8 *2 |
*5~*0 |
*2 |
Welcome for your inquiry about forged steel grinding balls
Country: | China |
Model No: | 50Mn/60Mn/65Mn |
FOB Price: | 700 ~ 1000 / Ton ( Negotiable ) Get Latest Price |
Place of Origin: | Shandong China |
Price for Minimum Order: | 700 per Ton |
Minimum Order Quantity: | 10 Ton |
Packaging Detail: | container bags/steel drums |
Delivery Time: | within 20 days after 30% deposit |
Supplying Ability: | 2000 Ton per Month |
Payment Type: | L/C, T/T |
Product Group : | - |