FOB Price
Get Latest Price500000 ~ 900000 / Piece ( Negotiable )
|1 Piece Minimum Order
Country:
China
Model No:
-
FOB Price:
500000 ~ 900000 / Piece ( Negotiable )Get Latest Price
Place of Origin:
shandong china
Price for Minimum Order:
500000 per Piece
Minimum Order Quantity:
1 Piece
Packaging Detail:
suitable for ocean shipping
Delivery Time:
within 40 days after receiving of the deposit
Supplying Ability:
50 Set per Month
Payment Type:
T/T, L/C
Product Group :
-
Contact Person Mr. Allen
Zhuanbu Industry Area,Linyi City, Shandong Province, China, Linyi, Shandong
1.introduction
Aerated concrete brick (light brick ) is the light and porous building material. It has light keeping temperature cant burn and other advantages .It can be made into many kinds of bricks(for example:**0×**0×**0,*0×*0×**0,**0×**5×*3,**0×**0×**5),they could be used industry building and common building. they are more and more popular in the world. in the future, they will replace the Clay brick completely.
2.Areated concrete common conception
Common concrete density is usually ********0kg/m3,but Aerated concrete are **0kg/m3,**0kg/m3,**0kg/m3.It has not the big grain, main use silicon material (for example: coal ash, sand, stone dust and others ),through making the material small for example sand, they can be used directly if has enough degree of small (for example coal ash. Mixing calcium material lime cement water to a special slop, then add the aluminum dust and the additive. Make the aluminum dust and the special slop have a Chemical reflect. then produce Hydrogen to make the concrete slop to expanding or swell, foam. Next, put them into the curing room to concreting cutting steaming curing, last, there will become the light bricks, the porous rate is ****0%.
3.Advantages
Main Material: coal ash sand waste mine material coal stones dust and other silicon materials.
foam block machine,aerated autoclaved concrete plant, AAC block, AAC production line, AAC plant ,AAC brick, autoclave aerated concrete block, concrete block machine, light weight block
1 Product weight is according to **0kg/m3 to control.
2 annual capacity **0,**0M3.
3 set raw material proportion: cement 6.5%, raw lime *3%, flyash *8%, gypsum 3%, aluminum paste powder **0g/M3.
4 water and material rate 0.**1
5 one mould product 2.*8M3
6 Casting slurry cycle time **6 minutes, cut cycle time 5 minutes.
7 casting slurry temperature ****2 degree
8body quiet stop. Time is 1.**2.5housr, temperature ****0 degree, after quiet stop body strength is 0.***0.*8Mpa
9 Steam curing cycle time, come in and out autoclave about 0.5hour, steam curing cycle time about is 6 hours/1.6Mpa, total 6.5 hours.
*0. Cement lime fly ash style aerated block raw material proportion
name |
unit |
Cement lime fly ash |
flash |
% |
****0 |
cement |
% |
***5 |
lime |
% |
****5 |
gypsum |
% |
**5 |
Aluminum powder paste(**0kg/m3) |
1/****0 |
8 |
Water & material rate |
|
0.***0.*5 |
Casting system |
OC |
****0 |
Aluminum mixing time |
S |
****0 |
*1. Cement lime Sand style aerated block raw material proportion
Name |
Unit |
Cement Lime Sand |
Sand |
% |
****5 |
Cement |
% |
****0 |
Lime |
% |
****0 |
Gypsum |
% |
**3 |
Aluminum powder paste(**0kg/m3) |
1/****0 |
8 |
Water & material rate |
|
0.***0.*5 |
Casting system |
OC |
****8 |
Aluminum mixing time |
S |
****0 |
Reference: cement is *2.5 Portland or *2.5 common cement
Country: | China |
Model No: | - |
FOB Price: | 500000 ~ 900000 / Piece ( Negotiable ) Get Latest Price |
Place of Origin: | shandong china |
Price for Minimum Order: | 500000 per Piece |
Minimum Order Quantity: | 1 Piece |
Packaging Detail: | suitable for ocean shipping |
Delivery Time: | within 40 days after receiving of the deposit |
Supplying Ability: | 50 Set per Month |
Payment Type: | T/T, L/C |
Product Group : | - |