Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally.
Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
aac production line aac production line aac production line aac production line
Next

aac production line

FOB Price

Get Latest Price

500000 ~ 900000 / Piece ( Negotiable )

|

1 Piece Minimum Order

Country:

China

Model No:

-

FOB Price:

500000 ~ 900000 / Piece ( Negotiable ) Get Latest Price

Place of Origin:

shandong china

Price for Minimum Order:

500000 per Piece

Minimum Order Quantity:

1 Piece

Packaging Detail:

suitable for ocean shipping

Delivery Time:

within 40 days after receiving of the deposit

Supplying Ability:

50 Set per Month

Payment Type:

T/T, L/C

Product Group :

-

Contact Now
Free Member

Contact Person Mr. Allen

Zhuanbu Industry Area,Linyi City, Shandong Province, China, Linyi, Shandong

Contact Now

Product Specification

  • forming period:5-6minute

Product Description


aac production line

1.introduction

    Aerated concrete brick (light brick ) is the light and porous building material. It has light keeping temperature cant burn and other advantages .It can be made into many kinds of bricks(for example:**0×**0×**0,*0×*0×**0,**0×**5×*3,**0×**0×**5),they could be used industry building and common building. they are more and more popular in the world. in the future, they will replace the Clay brick completely.

 

 2.Areated concrete common  conception

     Common concrete density is usually ********0kg/m3,but Aerated concrete are **0kg/m3,**0kg/m3,**0kg/m3.It has not the big grain, main use silicon material (for example: coal ash, sand, stone dust and others ),through making the material small for example sand, they can be used directly if has enough degree of small (for example coal ash. Mixing calcium material lime cement water to a special slop, then add the aluminum dust and the additive. Make the aluminum dust and the special slop have a Chemical reflect. then produce Hydrogen to make the concrete slop to expanding or swell, foam. Next, put them into the curing room to concreting cutting steaming curing, last, there will become the light bricks, the porous rate is ****0%.

3.Advantages

 Main Material: coal ash sand waste mine material coal stones dust and other silicon materials.

 foam block machine,aerated autoclaved concrete plant, AAC block, AAC production line, AAC plant ,AAC brick, autoclave aerated concrete block, concrete block machine, light weight block

1  Product weight is according to **0kg/m3 to control.

2 annual capacity **0,**0M3.

3  set raw  material proportion: cement 6.5%, raw lime *3%, flyash *8%, gypsum 3%, aluminum paste powder **0g/M3.

4   water and material rate 0.**1

5 one mould product 2.*8M3

6 Casting slurry cycle time **6 minutes, cut cycle time 5 minutes.

7 casting slurry temperature ****2 degree

8body quiet stop. Time is 1.**2.5housr, temperature ****0 degree, after quiet stop body strength is 0.***0.*8Mpa

9 Steam curing cycle time, come in and out autoclave about 0.5hour, steam curing cycle time about is 6 hours/1.6Mpa, total 6.5 hours.

*0.  Cement lime fly ash style aerated block raw material proportion

name

unit

Cement lime fly ash

flash

%

****0

cement

%

***5

lime

%

****5

gypsum

%

**5

Aluminum powder paste(**0kg/m3)

1/****0

8

Water & material rate

 

0.***0.*5

Casting system

OC

****0

Aluminum mixing time

S

****0

*1.  Cement lime Sand style aerated block raw material proportion

Name

Unit

Cement Lime Sand

Sand

%

****5

Cement

%

****0

Lime

%

****0

Gypsum

%

**3

Aluminum powder paste(**0kg/m3)

1/****0

8

Water & material rate

 

0.***0.*5

Casting system

OC

****8

Aluminum mixing time

S

****0

Reference: cement is *2.5 Portland or *2.5 common cement

 

 

Country: China
Model No: -
FOB Price: 500000 ~ 900000 / Piece ( Negotiable ) Get Latest Price
Place of Origin: shandong china
Price for Minimum Order: 500000 per Piece
Minimum Order Quantity: 1 Piece
Packaging Detail: suitable for ocean shipping
Delivery Time: within 40 days after receiving of the deposit
Supplying Ability: 50 Set per Month
Payment Type: T/T, L/C
Product Group : -

Send a direct inquiry to this supplier

To:

Mr. Allen < Dongyue Machinery Group Co., Ltd >

I want to know: