Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally.
Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Coiled tubing
Next

Coiled tubing

FOB Price

Get Latest Price

3000 / ( Negotiable )

|

80 Ton Minimum Order

Country:

China

Model No:

-

FOB Price:

3000 / ( Negotiable ) Get Latest Price

Place of Origin:

China

Price for Minimum Order:

3000

Minimum Order Quantity:

80 Ton

Packaging Detail:

steel frame

Delivery Time:

60 days

Supplying Ability:

3000 Ton per Month

Payment Type:

T/T, L/C

Product Group :

-

Contact Now
Free Member

Contact Person judy

No.5, Zhengzhou, Henan

Contact Now

Product Description

This product carries out functions similar to wireline, but with added benefits. Wireline is a cabling technology that is also used in oil and gas well intervention. The advantage that coiled tubing has over wireline is the ability to pump chemicals through the coil and to push the coil into the hole, whereas wireline depends on gravity for this function.

In addition, coiled tubing can be a cheaper alternative to conventional drilling string. One reason is that it allows the continuous feeding of the tubing into the hole without constant interruptions. These interruptions are the result of the need to constantly add new drill pipe every time the hole is deepened. Frequent interruptions can prove to be quite time-consuming, and increase the rig time required.

Using coiled tubing can eliminate the drill string-feeding time by being continuously fed, which is a major economic advantage. The need for a lifting device, referred to as a "derrick, " can also be eliminated. This can further cut back on price by reducing the hourly cost of the rig.

Country: China
Model No: -
FOB Price: 3000 / ( Negotiable ) Get Latest Price
Place of Origin: China
Price for Minimum Order: 3000
Minimum Order Quantity: 80 Ton
Packaging Detail: steel frame
Delivery Time: 60 days
Supplying Ability: 3000 Ton per Month
Payment Type: T/T, L/C
Product Group : -

Send a direct inquiry to this supplier

To:

judy < Henan Xinhua Machinery factory >

I want to know: