FOB Price
Get Latest Price500 ~ 800 / Ton
|3 Ton Minimum Order
Country:
China
Model No:
-
FOB Price:
500 ~ 800 / Ton Get Latest Price
Place of Origin:
-
Price for Minimum Order:
500 per Ton
Minimum Order Quantity:
3 Ton
Packaging Detail:
Bevelled ends /plain ends, varnish coating, marking, plastic caps for end protecting, pacing In bund
Delivery Time:
7-35 days after receiving advanced payment.
Supplying Ability:
8000 Ton per Month
Payment Type:
D/P, L/C, T/T
Product Group :
Contact Person Shang
Cangzhou, Hebei
ASTM A*3 CARBON STEEL
ERW PIPES
O. D: *0mm***9.6mm
W. T: ***5mm
Length: ***2M, according to customers' requirements
International Standard: ISO ***1: ***8 API 5L GB
Standard: ASTM A*3 A**6 / BS ********5 GB********5 API 5L
Material: Q**5/Q**5/Q**5/Q**5 GR. B X*2 X*6 X*2 X*0 X*5 X*0
X*0(PSL1 & PSL2)
Product Usage:
Fluid, boiler, hydraulic, gas, oil, chemical fertilizer, structure
pipes etc.
1. For low pressure liquid delivery such as water, gas and oil
2. For construction, example: Building greenhouse
Making method:
Cold drawing, hot rolling, hot expanded
Packing:
Bevelled ends/plain ends, varnish coating, marking, plastic caps
for end protecting, packing in bundles(OD< =**1.3mm) according
to customers' requirements
Main market:
Middle East, Africa, North and South America, East and West Europe,
South, southeast Asia, Australia and so on
Place of Origin: Cangzhou, China
Productivity: ***0Ton/Month
Processing technology available:
Threading, coupling and with plastic caps protected
Payment: TT, LC and DP are all ok
Trade Terms: FOB / CFR /CIF
MOQ: 5T
Delivery period:
According to the material, the standard and the quantity of the
contract. (will be informed in the quotation sheet)
Company info.
YANSHAN QIANYI PIPE INDUSTRY Co., Ltd is a professional exporter
and reputed supplier
Country: | China |
Model No: | - |
FOB Price: | 500 ~ 800 / Ton Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 500 per Ton |
Minimum Order Quantity: | 3 Ton |
Packaging Detail: | Bevelled ends /plain ends, varnish coating, marking, plastic caps for end protecting, pacing In bund |
Delivery Time: | 7-35 days after receiving advanced payment. |
Supplying Ability: | 8000 Ton per Month |
Payment Type: | D/P, L/C, T/T |
Product Group : | ERW pipe |