Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally.
Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
excavator two segment long reach boom excavator two segment long reach boom excavator two segment long reach boom excavator two segment long reach boom
Next

excavator two segment long reach boom

FOB Price

Get Latest Price

|

1 Piece Minimum Order

Country:

China

Model No:

-

FOB Price:

Get Latest Price

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

1 Piece

Packaging Detail:

-

Delivery Time:

30days

Supplying Ability:

-

Payment Type:

T/T

Product Group :

-

Contact Now
Free Member

Contact Person Ms. Melanie

Yanglang Road,Yangwu Community, Yichun, Jiangxi

Contact Now

Product Specification

  • Moving Type : Crawler Excavator

Product Description

Description
1.   Long reach boom are use for dredging rivers port construction, railway construction and groundwork construction, with high extensive operation scope, high efficiency and high security.
2.   We have over *0 years experience in designing and customize the long reach boom for all brand excavators.
3.   Applicable for all the excavator model,OEM service is also available.
4.   Advanced manufacturing process, Technique is in the line with global standards.
5.   We have all the installation dimensions of most excavator, we can customize this long reach boom for your excavator.
6.   The main material of this long boom is Q**5B + Q**0.
7.   The long reach boom include lubricant pipe system, hydraulic system, 1 bucket, 1 bucket cylinder, 1 linkage, 6 pins and 4 hoses.
8.   Before welding, we have use big edge milling machine mill(taper process) the edge of the sheet. So the welding can go to the internal of the steel-sheet and make the structure have higher performance. Also the inside have strength plate make it more stronger.
9.   If necessary, extra pipeline can be added to suit to some extra application.
*0. Stick cylinder of the long boom, can use your original stick cylinder to save the cost, if you need the stick cylinder, we also can prepare for you.
*1. Some parts can be consolidated using thicker plate or overlapping another plate  for heavy-duty application.
*2. Welding is protective-gas welding, the protective gas is *0% Argon and *0% CO2 mixed. This is golden standard for protective gas. 
*3. Before welding, we have use big edge milling machine mill the edge of the sheet. So the welding can go to the internal of the steel-sheet and make the structure have higher performance.
*4. For all base,joint and other main structure of the long boom, we use boring machine adjust the precision after welding, to avoid the welding-stress leading to big tolerance.
*5. The manufacture time about *5 days. Warranty time 9 month after installation.
*6. We will also supply parts list for the long reach boom, so it's easy for Maintenance and after-sales service.

 

 
 

Country: China
Model No: -
FOB Price: Get Latest Price
Place of Origin: -
Price for Minimum Order: -
Minimum Order Quantity: 1 Piece
Packaging Detail: -
Delivery Time: 30days
Supplying Ability: -
Payment Type: T/T
Product Group : -

Related Products Bozhida Engineering company

Send a direct inquiry to this supplier

To:

Ms. Melanie < Bozhida Engineering company >

I want to know: