FOB Price
Get Latest Price830 ~ 950 / Metric Ton ( Negotiable )
|20 Metric Ton Minimum Order
Country:
China
Model No:
-
FOB Price:
830 ~ 950 / Metric Ton ( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
830 per Metric Ton
Minimum Order Quantity:
20 Metric Ton
Packaging Detail:
ton bag or steel drum
Delivery Time:
15 to 20 days
Supplying Ability:
3000 Metric Ton per Month
Payment Type:
T/T, L/C
Product Group :
Contact Person Mr. Donald
Shuangshan, Jinan, Shandong
Place of Origin: | Shandong China (Mainland) | Brand Name: | Huamin | Model Number: | *****0mm |
Application: | cement plants, Mines, Chemical industry, Power stations | Material: | Steel | Dimensions: | *****0mm |
Packaging Detail: | steel drum (******0kg per drum) or flexible container bag (***0kg per bag) |
Delivery Detail: | within *5 days after received the prepayment or L/C at sight |
Item | C | Cr | Si | Mn | S | P | Cu | Mo | Ni | Hardness |
Element | 0.**1.2% | ≤ 1.0 | 0.***0.6 | 0.**1.5 | ≤ 0.*4 | ≤0.*4 | ≤0.1 | ≤0.*5 | ≤0.1 | ****5 |
Nominal diameter (mm) |
Diameteical tolerance (mm) |
Weight of Single of forging ball in average |
Number of piece of One ton forging ball in average |
Surface hardness |
Impact toughness |
DIA *0 DIA *5 DIA *0 DIA *0 DIA *0 |
*2 *1 |
*2 *4 **0 **3 **3 |
****0 ****5 ***0 ***2 ***9 |
****5 |
≥*2 |
DIA *0 DIA *0 DIA *0 DIA *0 DIA **0 |
*3 *2 |
**8 ***0 ***4 ***6 ***0 |
***6 **9 **5 **3 **3 |
||
DIA **0 DIA **0 DIA **0 |
*4 *2 |
***7 ***2 ***0 |
**2 **0 **0 |
||
DIA **0 DIA **0 |
*4 *3 |
****8 ****1 |
*8 |
Country: | China |
Model No: | - |
FOB Price: | 830 ~ 950 / Metric Ton ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 830 per Metric Ton |
Minimum Order Quantity: | 20 Metric Ton |
Packaging Detail: | ton bag or steel drum |
Delivery Time: | 15 to 20 days |
Supplying Ability: | 3000 Metric Ton per Month |
Payment Type: | T/T, L/C |
Product Group : | forged steel ball |