Product Description
JCC Piping Engineering & Construction Co., Ltd provides
comprehensive services such as drawing conversion and design,
product manufacturing, warehousing, factory-based prefabrication,
on-site installation, testing and Commissioning of pipes in
petroleum oil and chemical industry, offshore oil and gas industry,
electrical energy industry, and ship piping systems.
We can manufacture pipe fittings in any material grade with a
typical lead time of 4 to 8 weeks by utilizing our group
manufacturing facility.
Fittings have been designed to address a number of factors which
are vital to achieve high performance in difficult oilfield
service. All fittings have wall thickness with ample erosion and
corrosion allowances.
High-pressure Manifold Fittings are manufactured from wrought alloy
steel. Fittings are die forged to ensure that they have a well
defined and correctly contoured grain flow, high integrity and
uniformity of shape. Elbows are produced from hollow bar, hot
formed on purpose-made bending machines.
In addition, large quantities of forging are held in stock, which
enables us to react quickly to requests for customized
specials.
We follow the listed standards below to ensure the quality of
products.
***-ASME B*1.3
***-MSS-SPP*5
***-API 6A
***-NACE MR****5
The process files are all supplied to keep the traceability.
Material: AISI ***0 Q&T
Design pressure: ****0psi,****0psi
Work temperature: **0℃—*0℃
Acceptance standard:ASME B*6.9, MSS-SP**5, API 6A, NACE MR****5
Country: |
China |
Model No: |
-
|
FOB Price: |
( Negotiable ) (Negotiable)
Get Latest Price
|
Place of Origin: |
- |
Price for Minimum Order: |
- |
Minimum Order Quantity: |
- |
Packaging Detail: |
- |
Delivery Time: |
- |
Supplying Ability: |
- |
Payment Type: |
T/T, L/C |
Product Group : |
High Pressure Pipe Fittings
|