FOB Price
Get Latest Price400 ~ 1250 / Metric Ton ( Negotiable )
|50 Metric Ton Minimum Order
Country:
China
Model No:
-
FOB Price:
400 ~ 1250 / Metric Ton ( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
400 per Metric Ton
Minimum Order Quantity:
50 Metric Ton
Packaging Detail:
standard export seaworthy packing
Delivery Time:
20-35 days after order confirmed
Supplying Ability:
300000 Metric Ton per Year
Payment Type:
L/C, T/T
Product Group :
Contact Person Ms. Tina
huoju road, Linyi, Other
Prime hot-dipped galvanized steel coils
Standard: JIS G***2 SGCC€ASTM A**3€EN*0**2 DX*1D+Z
Thickness: 0.***1.2mm(tolerance:+/*0.*2mm)
Width: *******0mm(tolerance:+/*0.*2mm)
Coil weight: **8Ton
Coil ID: **8mm/**0mm
Packing: Standard seaworthy export packing
MOQ: *5Ton for each specification
Delivery Time: ****5 days after receive original L/C or Deposits
Terms of payment: L/C at sight or T/T(deposits needed)
Port of loading: Qingdao, China
Pre-painted galvanized steel coils
Standard: JIS G*312 SGCC€ASTM A**3€EN*0**3 DX*1D+Z
Thickness: 0.**-0.5mm(tolerance:+/*0.*2mm)
Width: *******0mm(tolerance:+/*0.*2mm)
Top/Back coating: ****5µm/**7µm
Coil weight: **8Ton
Coil ID: **8mm/**0mm
Packing: Standard seaworthy export packing
MOQ: *0Ton for each color
Delivery Time: ****5 days after receive original L/C or Deposits
Terms of payment: L/C at sight or T/T(deposits needed)
Port of loading: Qingdao, China
Country: | China |
Model No: | - |
FOB Price: | 400 ~ 1250 / Metric Ton ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 400 per Metric Ton |
Minimum Order Quantity: | 50 Metric Ton |
Packaging Detail: | standard export seaworthy packing |
Delivery Time: | 20-35 days after order confirmed |
Supplying Ability: | 300000 Metric Ton per Year |
Payment Type: | L/C, T/T |
Product Group : | prime hot dip glavanized steel coils |