Shanxi Zhongtu TrafficTechnology Co., Ltd

NO.32 Gaoxinstreet High-tech district,Taiyuan,Shanxi,China

Free Member

MMA Two-Component High-light Pavement Marking material (MMA Cold Plastic)

China

---

3300 ~ 4186 / Ton ( Negotiable ) Get Latest Price

Shanxi

3300 per Ton

1 Ton

25kg/drum

Depends on the quantity of order

500 Ton per Month

Western Union, L/C, T/T

Product Specification

MMA two component high light road marking paint

---

Acrylic

Road Marking Paint

Spray/screed

Liquid Coating

Changda

-

-

>/=350 mcd(white)

</=15minutes

2

</=35mg

Product Description

Advantage:
*  Material from Evonik Industries;
*  Excellent brightness and night visibility;
*  Anti-crack & strong tenacity;
*  Wear resistance is 2 times better than thermoplastic marking;
*  Excellent aging resistance;
*  Environment protection,100% solid content and no volatile substances.
 
Construction mode includes spraying application and screed application and extruded application.
Consumption Actual consumption depends on the thickness of marking & Roughness of pavement & Local temperature environment )
surface temperature 25℃ Spraying application
(0.5mm-0.7mm)
Screeding application
(1.2mm-1.5mm)
thickness 0.6mm 1.2mm
paint 1kg/㎡ 3kg/㎡
Hardner 15g/㎡ 45g/㎡
primer 150g/㎡  
Glass beads 0.5kg/㎡ 0.5kg/㎡
Dosage table of curing agent (Used in B component)
Paint Hardner Surface temperature(℃) Ratio of BPO Surface dry time    (Min) Curing time  (Min)
B component White color
powder
5 750g-800g 25 50
15 700g-750g 20 35
25 650g-700g 10 20
35 550g-600g 8 15

Technical Data:
·Retroreflective valve:≤350 mcd(white)
·Curing time:≤15minutes
·Density (g/cm³):2
·Abrasion resistance:≤35mg
Color:White/Yellow /Customize other colors
 
The matters needing to attention during the construction
  • Dry & Clean & flat of road surface.
  • Damaged road should be repaired before applying.
  • Before applying,should add the hardner according to the ratio to the MMA two-component
(Component B) pavement marking paint,then stir well.
  • Avoid breathing vapors,eyes and skin should not touch the coating.
  • During Construction,eating and drinking and smoking is prohibited.
 
Attention of construction
1. Clean and dry road surface.
2. Construction environment temperature is about 10℃ to 40℃,surface temperature generally
is above 5 ℃。
3.  The curing time depends on the consumption of curing agent & the temperature of construction
environment,but has nothing to do with the thickness of the coating.
4.  Strictly prohibited from direct sunlight during transport and storage,stored in ventilated
and shade and dry place,the storage temperature should be controlled in 0℃ to 40℃.
5. During screeding application,it is recommended that two scraper buckets be equipped for
continous replace.
 

Contact Us

Shanxi Zhongtu TrafficTechnology Co., Ltd

Contact Person

Ms. Vicky

Company

Shanxi Zhongtu TrafficTechnology Co., Ltd

Address

NO.32 Gaoxinstreet High-tech district, Taiyuan, Shanxi, China,030006

To

Subject

Message

I want to know

More Products From Other Suppliers

Book call on your favorite time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services