FOB Price
Get Latest Price( Negotiable )
|1 Set Minimum Order
Country:
China
Model No:
kwwd
FOB Price:
( Negotiable )Get Latest Price
Place of Origin:
china
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
standard
Delivery Time:
within tendays after deposits
Supplying Ability:
100 Set per Year
Payment Type:
T/T, L/C, D/P
Product Group :
Contact Person xie
gongyi kangdian, Zhengzhou, Henan
specifications | KWWD6 | KWWD8 | KWWD*0 | KWWD*2 | KWJWD*6 | KWWD*0 | KWWD*4 | KWWD*0 |
Net belt width(mm) | **0 | **0 | ***0 | ***0 | ***0 | ***0 | ***0 | ***0 |
Dry length(m) | ***2 | ***2 | ***6 | ***6 | ***2 | ****6 | ****0 | ****0 |
Feed length(m) | 1 | 1 | 1 | 1 | 1 | 1.5 | 1.5 | 2 |
Drive length(m) | 1 | 1 | 1 | 1 | 1 | 1.5 | 1.5 | 2 |
Dry area(m2) | 3.***6 | 4.***8 | ***0 | 7.***6 | *2.****5.6 | *****0 | *8.****0 | *****0 |
layer | **5 | |||||||
Layer spacing(mm) | ******0 | |||||||
Carrying capacity | *****0 Kg/m2 | |||||||
Using temperature | Carbon steel≤**0 C°,Stainless steel≤**0 C° | |||||||
Evaporation intensity | ***0kg water/m2.h | |||||||
Heat source | Hot air, electricity, steam | |||||||
speed | 0.***1m/min | |||||||
Transmission powerKw | 1.**2.2 | 1.**2.2 | 1.**2.2 | 1.**3 | 1.**3 | 1.**4 | **7.5 | ***1 |
supporting equipment | Conveying equipment, hot blast stove, dust removal equipment, induced draft fan, etc |
Country: | China |
Model No: | kwwd |
FOB Price: | ( Negotiable ) Get Latest Price |
Place of Origin: | china |
Price for Minimum Order: | - |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | standard |
Delivery Time: | within tendays after deposits |
Supplying Ability: | 100 Set per Year |
Payment Type: | T/T, L/C, D/P |
Product Group : | dryer series |