FOB Price
Get Latest Price5000 ~ 10000 / Ton ( Negotiable )
|2 Piece Minimum Order
Country:
China
Model No:
BES-50
FOB Price:
5000 ~ 10000 / Ton ( Negotiable )Get Latest Price
Place of Origin:
China
Price for Minimum Order:
5000 per Ton
Minimum Order Quantity:
2 Piece
Packaging Detail:
wooden and steel packing
Delivery Time:
50 days
Supplying Ability:
50 Piece per Month
Payment Type:
T/T
Product Group :
-
Contact Person Chen
No.168,Dongzhang Industries Zone,Chengliu Town, Jiyuan, Henan
Material:DIN****0,DIN *1CrMo*0,*5CrMo and so on.
Smelting Method:Electric Arc Furnace + Refining Furnace(Vacuum Rrc Degassing).
1. Size: DN *0MM-DN ***0MM Mould for Forged Pipe Mould.
2. Material Grade:
2.1 The steel used for the mould:DIN****0,and the steel: *1CrMo*0.
2.2 Steel-making method:basic arc furnace and ladle refining furnace refining melted (vacuum degassed)
2.3 Ultrasonic flaw detection
The forging of the mould will be ultrasonically tested as per JB/T********6,and the grade of the detection is in the following:
A: Without bursts,crack,shrinking hole and other defects.
B: The defect with size within OD2mm can be ignored.
C: Individual defect with diameter of φ2~φ4mm is permitted,and the distance of the neighboring
defects should be more than the *0 times of the bigger one’s.For **0cm2‘s area,the quantities of
the defects with diameter of φ2~φ4mm should not exceed 3.
D:There should not have compact district.
3. Chemical Composition:
Element |
C |
Si |
Mn |
S≤ |
P≤ |
Cr |
Mo |
Cu≤ |
Chemical Comp. |
0.***0.*3 |
0.***0.*0 |
Country: | China |
Model No: | BES-50 |
FOB Price: | 5000 ~ 10000 / Ton ( Negotiable ) Get Latest Price |
Place of Origin: | China |
Price for Minimum Order: | 5000 per Ton |
Minimum Order Quantity: | 2 Piece |
Packaging Detail: | wooden and steel packing |
Delivery Time: | 50 days |
Supplying Ability: | 50 Piece per Month |
Payment Type: | T/T |
Product Group : | - |