FOB Price
Get Latest Price|
1 Piece Minimum Order
Country:
China
Model No:
-
FOB Price:
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Piece
Packaging Detail:
Pallet
Delivery Time:
2~5 weeks after receiving the advance deposit
Supplying Ability:
-
Payment Type:
PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T
Product Group :
Contact Person Ms. janey
Macun, Jiaozuo, Henan
pulley lagging
ZE-LZ
Rubber Pulley Lagging has CN-bonding layer. Thickness: 8mm, *0mm,
*2mm, *5mm, *0mm,etc
1.Adhesive Strength with Pulley:*2.6 N/mm
2.Pressure during vulcanization: *0kg/cm2
3.Wear resistant
4.Long work life
5.High friction coefficient
6.Good elastic rubber to reduce its pressure
7.Can be installed on site.
Details for price:
1、Flame resistant or not.
2、Rubber
thickness
3、Specifications of
pulleys: Diameter and length of the pulleys.
Order NO. |
Commodity |
Thickness(mm) |
ZE-LZ*0 |
Plain Surface Pulley Lagging |
*0 |
ZE-LZ*2 |
Plain Surface Pulley Lagging |
*2 |
ZE-LZ*5 |
Plain Surface Pulley Lagging |
*5 |
ZE-LZ*0 |
Plain Surface Pulley Lagging |
*0 |
ZE-LZL*0 |
Diamond Pulley Lagging |
*0 |
ZE-LZL*2 |
Diamond Pulley Lagging |
*2 |
ZE-LZL*5 |
Diamond Pulley Lagging |
*5 |
ZE-LZL*0 |
Diamond Pulley Lagging |
*0 |
Country: | China |
Model No: | - |
FOB Price: | Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | 1 Piece |
Packaging Detail: | Pallet |
Delivery Time: | 2~5 weeks after receiving the advance deposit |
Supplying Ability: | - |
Payment Type: | PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T |
Product Group : | Pulley lagging |