FOB Price
Get Latest Price1000 / Ton
|1 Ton Minimum Order
Country:
China
Model No:
High Manganese Steel
FOB Price:
1000 / Ton Get Latest Price
Place of Origin:
Henan China
Price for Minimum Order:
1000 per Ton
Minimum Order Quantity:
1 Ton
Packaging Detail:
International Export Standard
Delivery Time:
15-30 days
Supplying Ability:
500 Ton per Month
Payment Type:
T/T, L/C
Product Group :
Contact Person Mr. lerry
HI-TECH Industry Unit B Torch Building, Zhengzhou, Henan
Roller for Mesto Roller CrusherOverview
The scientific research personnel of our company have solved the problem of roll squeezer roller overlaying which is good progress on the powder cement industry. Our company can provide various types of rollers in line with different roll squeezers.
Roller for Mesto Roller CrusherFeatures
Roller for Mesto Roller CrusherApplication
Crusher Roller has been widely applied in grinding industry and Crusher Roller fit for mill.
Our Dingsheng Group CEO Mr. Luis a Senior Engineer;
National expert;
Vice-chairman of Chinese Casting Association Wear-resisting Casting Branch;
Vice director of National casting steel and smelting technology Professional Committee;
A member of China Metallo-graphy Anti-abrasion Material Academic Board;
A standing member of China Abrasion Failure and Prevention Professional Committee;
Vice President of China Sand Stone Association and so on.
Especially, our Experts engineer Mr. Zhou Pingan who was graduate student of Tsinghua University and graduated from Tsinghua University in ***5.He is the Total Consultant of Belgium Magotteaux Wear-resistant parts in spare parts all time.
He is The Chinese mechanical engineering society wear failure and anti-wear technology professional committee reputation director and Institute of Chinese foundry advisors.
Country: | China |
Model No: | High Manganese Steel |
FOB Price: | 1000 / Ton Get Latest Price |
Place of Origin: | Henan China |
Price for Minimum Order: | 1000 per Ton |
Minimum Order Quantity: | 1 Ton |
Packaging Detail: | International Export Standard |
Delivery Time: | 15-30 days |
Supplying Ability: | 500 Ton per Month |
Payment Type: | T/T, L/C |
Product Group : | Wear Parts |