Product Description
Category: SBS Modified Bitumen Waterproof Membrane finished PE film
Description: Keshun-SBS Waterproof Membrane materials using
polyester reinforcement for waterproofing is a new type of
wateproof material,it's made from polyester felt as its
reinforcement featuring high strength,elongation amd corrision
resistance, SBS compound as its modifier for meeting the torched-on
applications, it shall be covered with polyethylene
membrane(PE),aluminium foil, colorful sand or mineral granule on
its top surface and polyethylene membrane(PE)coated on its under
face. This series of membrane is designed for the waterproofing of
underground construction such as tunnel, subway, basement,roofs and
pools etc. 2.The special formulation of fire enables the membrane
to be applied directly with primer. This application is named as
"Torched on application". SBS Membrane installation procedure:
1.Base processing:the base surface must be clean,solid,level,dry;no
grit,rift and loosing dust. For a large recess,fill it with cement
mortar and then level it. Remove the protrusion and clean dust.If
working on base slab or lateral face,water lowering should be done.
2. Painting primer:before laying the membrane,clean the dust on the
surface of concrete base with dust catcher or dust-blower;then
paint entirely with treatment agent of DY primer for
waterproofing(for purpose of dust consolidation and high adhesive
effect). 3.Heat to melt: place membrane correctly, fire torch, heat
the membrane with base entirely, when the surface of the membrane
is black and bright with a fusion layer, apply the membrane and
press it into a solid and flat state.Before the membrane is cool,
seal the edge of joint by float. 4.Requirements for lapping: There
should be less than 3 layers of lapping, with the joint seams
appearing as"T" type,avoid 4 layers of lapping.The width of
longitudinal lapping is between *0 and *0mm,and of end-lap joint
**0mm 5.After application Package and transportation: Membranes
should be stored under dry and ventilated conditions. Different
types of membranes must be piled separately. Under usual condition,
storage period is one year since production date. Membrane roll
should be put vertically during transportation. It should be kept
away from sunshine and rainwater. Requirements for surroundings:
The base should be dry and clean. Do not work in the rainy or snowy
day. Do not work under heavy wind(above 5 grade) Unsuitable for
construction below 0°C If it is rain or snow in the process of
construction, protective measure to the laid membrane is must.
Country: |
China |
Model No: |
SBS Bitumen Waterproof Membrane
|
FOB Price: |
2.15 ~ 3.25 / Square Meter (Negotiable)
Get Latest Price
|
Place of Origin: |
- |
Price for Minimum Order: |
2.15 per Square Meter |
Minimum Order Quantity: |
1000 Square Meter |
Packaging Detail: |
Packing to rolls with strips |
Delivery Time: |
10 days for one 20 feet container after received |
Supplying Ability: |
8000 Square Meter per Day |
Payment Type: |
T/T |
Product Group : |
- |