Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally.
Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
SCV Vibrator
Next

SCV Vibrator

FOB Price

Get Latest Price

( Negotiable )

|

1 Set Minimum Order

Country:

China

Model No:

SCV30, SCV50, SCV70, SCV90

FOB Price:

( Negotiable ) Get Latest Price

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

1 Set

Packaging Detail:

-

Delivery Time:

Lead time 45 days

Supplying Ability:

20 Set per Week

Payment Type:

T/T, L/C, D/A, D/P, Western Union

Product Group :

-

Contact Now
Free Member

Contact Person Bryan

Room 2307, Johnsons Building, No. 145 PuJian road, Shanghai, China, Shanghai, Shanghai

Contact Now

Product Description

Introduction

Trust V-series high frequency hydraulic vibratory hammers have been promoting and applying rapidly in the fields of high speed rail, marine engineering, land reclamation and bridges, dock engineering, retaining and protecting for deep foundation excavation and foundation treatment of ordinary building etc. The equipment for the introduction of foreign advanced technology, with independent intellectual property rights, domestic original hydraulic vibration hammer, superior performance, adopts hydraulic power station as the hydraulic power source, through the high frequency vibration from the vibration box, relaxed the pile into the soil with low noise, high efficiency, no damage when turning, etc. 

Product Features

Vibration sinking pile speed is 4 to 7 m/min, the fastest is up to *2 m/min (in non-muddy soil). Construction speed is faster than other vibratory hammer machinery by *0% to **0% higher efficient than pneumatic hammer and diesel hammer. 

Besides rock, high frequency vibratory hydraulic hammer is suitable for almost any bad geological conditions. Construction can easily penetrate the pebble layer, clip sand bed geology, etc.

High frequency hydraulic vibratory hammer, with noise reducing speakers, fully meet the requirement of environmental protection in urban construction.

Suitable for any shape, any material of the pile, such as steel pipe pile, concrete pipe, practicable for *******0mm pipe diameter.

 

Country: China
Model No: SCV30, SCV50, SCV70, SCV90
FOB Price: ( Negotiable ) Get Latest Price
Place of Origin: -
Price for Minimum Order: -
Minimum Order Quantity: 1 Set
Packaging Detail: -
Delivery Time: Lead time 45 days
Supplying Ability: 20 Set per Week
Payment Type: T/T, L/C, D/A, D/P, Western Union
Product Group : -

Send a direct inquiry to this supplier

To:

Bryan < Shanghai Trust Machinery Co Ltd >

I want to know: