FOB Price
Get Latest Price600 ~ 700 / Ton ( Negotiable )
|500 Kilogram Minimum Order
Country:
China
Model No:
a36
FOB Price:
600 ~ 700 / Ton ( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
600 per Ton
Minimum Order Quantity:
500 Kilogram
Packaging Detail:
in bundles
Delivery Time:
5- 10 days after receiving the deposit
Supplying Ability:
3000 Ton per Month
Payment Type:
T/T, L/C, D/P, Western Union
Product Group :
Contact Person Ms. Sai
shuiyuan road, tianjin, Tianjin
Tianjin
Emerson Commercial and Trade Co.,Ltd located in Baodi District,
Tianjin, China, mainly provide steel plate and sheet processing
service. The processing works concludes cutting the larger plate
into the small sizes customer demand, cut by drawing, cut to
special sizes, weld the cut parts by drawing, also make galvanizing
processing or surface painting on the final processed parts.
Tianjin Emerson Commercial and Trade Co.,Ltd has large stocks for
the carbon steel and low alloy steel plates and sheets, especially
have the thick plate and heavy plates on stock, also can provide
the special material and large size steel plates, boiler and
pressure vessel steel plate, marine steel plate, hot rolled steel
plate for new production. Tianjin Emerson Commercial and Trade
Co.,Ltd also has hollow bars, thick wall seamless pipes and tubes
on stock. Tianjin Emerson Commercial and Trade Co.,Ltd can provide
good service for customer, good quality products, fast delivery,
and after-sale service, Tianjin Emerson hopes to build good
cooperation with everyone interested.
2. steel plate , carbon steel plate, hot rolled steel plate, mild
steel plate.
STEEL PLATE WEIGHT/PER PIECE(KG)= LENGTH*WIDTH*THICKNESS*7.*5
For example: the plate length is 6 meters, width 2 meters, thickness *0mm,
the weight of per plate: 6*2**0*7.*5=***6kgs
Country: | China |
Model No: | a36 |
FOB Price: | 600 ~ 700 / Ton ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 600 per Ton |
Minimum Order Quantity: | 500 Kilogram |
Packaging Detail: | in bundles |
Delivery Time: | 5- 10 days after receiving the deposit |
Supplying Ability: | 3000 Ton per Month |
Payment Type: | T/T, L/C, D/P, Western Union |
Product Group : | steel plate |