Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally.
Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Subway / tram Drain
Next

Subway / tram Drain

FOB Price

Get Latest Price

1000 ~ 1200 / Ton ( Negotiable )

|

200 Meter Minimum Order

Country:

China

Model No:

K100, K150, K200

FOB Price:

1000 ~ 1200 / Ton ( Negotiable ) Get Latest Price

Place of Origin:

-

Price for Minimum Order:

1000 per Ton

Minimum Order Quantity:

200 Meter

Packaging Detail:

about 20 MT per 20

Delivery Time:

within 30 days after the sales contract

Supplying Ability:

3000 Ton per Year

Payment Type:

T/T, L/C, D/A, D/P

Product Group :

-

Contact Now
Free Member

Contact Person fergus

The new model road, Nanjing, Jiangsu

Contact Now

Product Specification

Product Description

Tram gutter drainage system is designed for the needs of the tram for drain off water. Products have many advantages,such as  energy saving, environmental protection, new materials as raw materials, instead of the traditional resin cement in concrete, with high compressive and flexural resistance, cold, corrosion, weathering, easy to install, easy to maintain, body shape, appearance beautiful appearance and other characteristics. With ductile iron cover, the products are apply to European standard EN***3 under the A*5 to D**0 various load levels to met the needs of the tram drainage.

Material prooerties:
1.polymer concrete :                based on polyester resin
2.Compression resistance:      ***3KG/CM2  
3.Flexural strength:                  **8 KG/CM2 
4.Density:                                 LESS THAN 0.*5%
5.Water penetration level:        0MM  

Country: China
Model No: K100, K150, K200
FOB Price: 1000 ~ 1200 / Ton ( Negotiable ) Get Latest Price
Place of Origin: -
Price for Minimum Order: 1000 per Ton
Minimum Order Quantity: 200 Meter
Packaging Detail: about 20 MT per 20
Delivery Time: within 30 days after the sales contract
Supplying Ability: 3000 Ton per Year
Payment Type: T/T, L/C, D/A, D/P
Product Group : -

Send a direct inquiry to this supplier

To:

fergus < Nanjing Yuanyou Engineering Materials CO., Ltd. >

I want to know: