Product Description
1.Ability of machine processing The way of processing: the max
processing equipment and prcessing ability. Steel casting: *0 tons
arc-furnace steelmaking, *0Tlf refiner furnace; the max elevating
capacity **5t; the max casting products *0t, dimension of casting
products(length, width, high) 8.5*4.5*3m, spun casting(min outer
diameter, min wall thickness, max length) Diameter ***0**5****0mm;
Various specification steel strands. Casting iron: 7.5t/h blast
cupola, 7.5t main frequency furnace, max casting product is *2t.
Casting copper: 2.5t reverberatory furnace, 1.5t main frequency
furnace, 1t vacuum-induction furnace, 0.2t vacuum casting plant,
max casting product is 2.5t Forging: ***0t water press, 1.5t air
hammer, max forging steel ingot: length is *0t, thickness is *7t
Rivet welding: *0****0mm folder, ***0t oil press, *2t edge planner,
6**0m***0mm digital controlled cutting, Diameter *0mm didital
controlled pipe bender, max elevating capacity is **0t 2.Heating
treatment: ****0****0****0mm annealing furnace(max furnace is **0t,
the high temperature is ****0C), ***0****0****0mm hardening
furnace, Diameter ***0****0mm line-frequency hardening machine
tool. Lathe: Diameter *0m vertical lathe, Diameter **0mm heavy
machine vertical lathe Boring machine:Diameter **0mmDiameter **0mm
heavy machine vertical lathe Shaper: ***0****0****0 Planing
machine: *5*3m planer Grinding machine: Diameter **0****0mm
cylindrical grinder, **0****0mm surface grinder. Drilling: *0m
drilling 3.steel rolling machine We professionally produce all
kinds of rolling mill and offer design, installation and debugging.
We can produce large, medium and small rolling steel train as
follow size: D**0, D**0, D**0, D**0, D**0, D**0, D**0, D**0, D**0.
The type of production line: rolling steel train for producing
steel plate, rolling steel train for producing reinforced bar,
production line for producing steel strip etc. xxxxx
Country: |
China |
Model No: |
01
|
FOB Price: |
(Negotiable)
Get Latest Price
|
Place of Origin: |
- |
Price for Minimum Order: |
- |
Minimum Order Quantity: |
- |
Packaging Detail: |
- |
Delivery Time: |
- |
Supplying Ability: |
- |
Payment Type: |
- |
Product Group : |
- |