Product Description
1.
First, feed the raw material into the reactor, the raw material
includes waste plastic, waste rubber, waste tyres. You can use the
manpower and the belt conveyer to feed, if you use the belt
conveyer, it reduces the manpower and time, it's high
effective.
2.Under the
reactor is the furnace, it is used to heat the reactor. The fuel
burns in it.When the fuel begins to burn, the raw material begins
to melt.At the same time, the fuel produces smoke, and the smoke
gets through the waste gas pipe into the desulfurization deduster,
it begins the first removing, If the fuel is coal, it burns and
produces the sulfur, when the sulfur gets in, meets with the
alcalescent water, they neutralize, then removes the sulfur, and
the dust in the smoke gets down the water, and remove the dust .if
not ,the smoke gets into the water-film cyclone ,because of the
function of the centrifugal force, the water becomes vapor, and the
dust gets down the water. Through the two process ,the waste
gas becomes environment protective and energy conservation.At last
,the clean gas goes into the atmosphere.
3.When the
temperature in the reactor is about **0 centigrades, it produces
the oil gas, it gets through the oil pipe into the gas separate;
it’s for the first time depositing. And the oil will be clean, if
not, it gets into the depositing tank, the heavy oil gets down, the
clean oil gets into the cooling pool, and cools down.Through the
cooling system , the oil becomes liquid, then flows into the oil
tank.
4.Some exhaust gas such as the CH4, it can't be
liquified at the normal temperature and pressure,so it goes into
the waste gas recycle system ,then to the furnace for burning ,not
only energy saving, but also environmental protecting.After all the
process ,there may be a little flammable gas can not be
used.For safety,you can fire it in the waste gas
combustion.
Country: |
China |
Model No: |
jzYT-10/8/5
|
FOB Price: |
45000 ~ 52000 / Set (Negotiable)
Get Latest Price
|
Place of Origin: |
henan,china |
Price for Minimum Order: |
45000 per Set |
Minimum Order Quantity: |
1 Set |
Packaging Detail: |
5T need a 40HQ and a 20GP, 8T need a 40HQ and a 40GP, 10T need a 40 Frame and a 20GP |
Delivery Time: |
15~20 working days after we receive 30%payment |
Supplying Ability: |
15 Set per Month |
Payment Type: |
T/T, L/C |
Product Group : |
waste plastic recycling plant
|