FOB Price
Get Latest Price|
- Minimum Order
Country:
UAE
Model No:
ADI666TC
FOB Price:
Place of Origin:
China (Mainland)
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
-
Delivery Time:
5 TO 35 DAYS
Supplying Ability:
-
Payment Type:
T/T, L/C
Product Group :
Contact Person Mr. Memon
Sheik Hasan, Ajman, UAE
Product | Leno Tarps / Leno Cover | |
Material | HDPE + LDPE | |
Weight | *0 GSM ~ **0GSM | |
Specification | Width: 1m*2.*4m | |
Length: *0m****0m (as per customers requirements) | ||
Treatment | UV treated or as per customers requirements | |
Mesh | 8X8 9X9 *0X*0 *1X*1 *2X*2 *4X*4 | |
Surface Dealing | LDPE laminated both sides | |
Package | Roll-up Tarp | Packed On Paper Tubes & |
Wrapped In The Same Tarpaulin Fabric | ||
Bale packing | A eyelet every 3 feet (about 1m) or customer-made, with four edges heat- sealed by PP rope in hem and four corners by black triangle. | |
( Ready Made Tarp) | ||
Feature | 1.Binding resistant, press resistant, | |
2. Waterproof, sun-resistant, anti-aging, tear proof. | ||
3.Antifreeze,corrosion resistant | ||
Color | transparent / clear green | |
Delivery time | Within *5 days after receiving the prepayment | |
Other | Logos or other company information could be printed on tarpaulin. | |
Reinforced strip(7.5cm) could be added. |
Country: | UAE |
Model No: | ADI666TC |
FOB Price: | Get Latest Price |
Place of Origin: | China (Mainland) |
Price for Minimum Order: | - |
Minimum Order Quantity: | - |
Packaging Detail: | - |
Delivery Time: | 5 TO 35 DAYS |
Supplying Ability: | - |
Payment Type: | T/T, L/C |
Product Group : | PE Tarpaulin |