FOB Price
Get Latest Price600 ~ 700 USD /
|5 Piece Minimum Order
Country:
USA
Model No:
-
FOB Price:
600 ~ 700 USD / Get Latest Price
Place of Origin:
China
Price for Minimum Order:
600
Minimum Order Quantity:
5 Piece
Packaging Detail:
Bundles
Delivery Time:
10 days
Supplying Ability:
5000 Ton per Month
Payment Type:
T/T, L/C
Product Group :
USA
Galvanized round steel pipe
|
Outer diameter |
Galvanized:1/2''-4''(21.3-114.3mm) |
|
Wall Thickness |
Pre galvanized:0.6-2.5mm |
|
Standard |
BS 1387,BS1139,EN39,EN10219,ASTM A53,ASTM A795, API 5L,GB/T3091etc. |
|
Cross Section |
Round/Square/Rectangular/Ovel etc. |
|
Type |
Electronic Resistance Welded (ERW ) |
|
End Treatment |
Plain / Thread / Coupling / Groove / Necking etc. |
|
Application |
Greenhouse/Scaffolding/Oil gas water transportation/Transportation,etc |
|
Delivery Time |
15-25 Days normally after your deposit . |
Standard
GB/T13793-1992,GB/T14291-2006, GB/T3091-1993,GB/T3092-1993,GB3640-88
BS1387/1985,ASTM A53/A36,EN39/EN10219,API 5L,GB/T9711.1-99 etc
zinc coating
pre galvanized steel pipe: 60-150g/m2
hot dipped galvanized steel pipe:200-400g/m2
application
Widely used in Structure, Accessorize,Construction,
Fluid transportation,machinery parts,the stress parts of the automobile
tractor parts and so on
Package
1) Big OD: in bulk
2) Small OD: packed by steel strips
3) Plastic bags
4) According to customers requirement
Delivery
Normally 7-20 days after get deposits or according to quantity
Certification
ISO 9001-2008 BV TUV SGS
advantage
1. reasonable price with excellent quality
2, abundant stock and prompt delivery
Product picture



Q. Why should I choose you?
A:*
contact us with your detailed inquiry, you will be replied within
24 hours.
* You are promised to obtain the best quality, price and
service.
* We'd like to provide samples for your
confirm.
* Wide excellent experiences with after-sale
service.
*Every process will be checked by responsible QC which
insures every product's
quality.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-30 days if the goods are not in stock, it is according to quantity.
| Country: | USA |
| Model No: | - |
| FOB Price: | 600 ~ 700 / Get Latest Price |
| Place of Origin: | China |
| Price for Minimum Order: | 600 |
| Minimum Order Quantity: | 5 Piece |
| Packaging Detail: | Bundles |
| Delivery Time: | 10 days |
| Supplying Ability: | 5000 Ton per Month |
| Payment Type: | T/T, L/C |
| Product Group : | steel pipe |