FOB Price
Get Latest Price1.1 ~ 1.5 / Piece
|100 Piece Minimum Order
Country:
China
Model No:
53103205 53103208 53103209
FOB Price:
1.1 ~ 1.5 / Piece Get Latest Price
Place of Origin:
-
Price for Minimum Order:
1.1 per Piece
Minimum Order Quantity:
100 Piece
Packaging Detail:
exporting wooden case
Delivery Time:
25-30days
Supplying Ability:
1000 Ton per Month
Payment Type:
T/T, L/C
Product Group :
JCB bucket teeth / tooth point for JCB 3CX 4CX
bucket teeth *******5 2.*5kgs
Double Flange side cutter *******8 /*******9 4.*5/ 4.8kgs
Single Flange side cutter *******6 *******7 4.5kgs
Usage : Digging Earth
JCB ROCK TOOTH
**2/C***8 **2/C***9 /**2/C***0
Weight:2.5/5.3/5.3 kgs
package details
JCB TEETH AND SIDE CUTTERS | |||
P/N | TYPE | U/W KG | Model |
**1/****5 (*3mm) | CENTER TOOTH | 2.*5 | JCB 2CX/3CX |
**1/****5 (*3mm) | 2.3 | JCB 2CX/3CX | |
2.8 | JCB 2CX/3CX | ||
**1/****6 | S/F SIDE CUTTER | 4.5 | JCB 2CX/3CX |
**1/****7 | 4.5 | JCB 2CX/3CX | |
**1/****8 (*3mm) | D/F SIDE CUTTER | 5 | JCB 2CX/3CX |
**1/****9 (*3mm) | 5 | JCB 2CX/3CX | |
**1/****8 | D/F SIDE CUTTER (4 holes) | 5.5 | JCB 2CX/3CX |
**1/****9 | 5.5 | JCB 2CX/3CX |
standard wooden case ***0***0***0mm
·A comprehensive range is available to suit:
Cat Komatsu , Daewoo , ,Hensley,Hitachi, H & L,Hyundai,· Volvo
· JCB.· Bofors· John Deere· Case· Kobelco· Liebherr
· Bobcat
Casting is a manufacturing process by which a
liquid material is usually poured into a mold, which contains a
hollow cavity of the desired shape, and then allowed to solidify.
The solidified part is also known as a casting, which is ejected or
broken out of the mold to complete the process. We use the
precision casting /lost wax casting to product
our bucket teeth
Casting Bucket Teeth
Material 1# Hardness
:****2HRC Impact Value :>*5J
Material 2# Hardness
:****2HRC Impact Value :>*0J
welcome for quotation !
Country: | China |
Model No: | 53103205 53103208 53103209 |
FOB Price: | 1.1 ~ 1.5 / Piece Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 1.1 per Piece |
Minimum Order Quantity: | 100 Piece |
Packaging Detail: | exporting wooden case |
Delivery Time: | 25-30days |
Supplying Ability: | 1000 Ton per Month |
Payment Type: | T/T, L/C |
Product Group : | bucket teeth |