FOB Price
Get Latest Price3.2 ~ 8 USD / Meter
|500 Meter Minimum Order
Country:
China
Model No:
-
FOB Price:
3.2 ~ 8 USD / Meter Get Latest Price
Place of Origin:
China
Price for Minimum Order:
3.2 per Meter
Minimum Order Quantity:
500 Meter
Packaging Detail:
carton
Delivery Time:
15-20 days
Supplying Ability:
100000 Meter per Week
Payment Type:
T/T, Western Union
Product Group :
-
Contact Person Lina
Beijing, Beijing
One-time Pre-installed Grouting Pipe:
LW(II Type) One-time Pre-installed Grouting Pipe is a new type of grouting pipe systems which is uniquely designed: stainless steel spring as supporting frame, a layer of non-woven cloth filter in the middle, and nylon mesh as outer layer.
It can seal any gaps ands holes on the joint area after grouting and widely used for water proof and air-tight in all kinds of concrete joints.
It is an ideal tubular water proof material pre-installed in structual joints attributes to its excellant properiyies of easy installation, reasonable price, simplified work, short working time and most important, not leak ensured.
Character:
1.Can confirm the sealing property of the construction joint at sceneTo grout only when the joint leaking
2.Rigid core Won't be pressed flat under concrete pressure so as to make the use of the grouting unobstructed
3.Non-woven cloth filter layer only allow water and grout flow through, keep cement outside of the pipe and make grouting liquid flow smoothly
4.FlexibilityExpediently placed in the corner, no need to cut and connect.
5.Apply to disposable various of grouting material.
6.Easy ,fast ,firm installation
Tech. Data:
Num. |
Items |
Index |
1 |
Outer diameter,mm |
****0 |
2 |
Inner diameter,mm |
6 |
3 |
Integrity between skeleton and outer woven cloth |
No seperation |
4 |
*0%Pressure ofOuter diameterdeformation N/mm |
≥*0 |
5 |
Filter cloth permeability coefficient K*0, cm/s |
0.****0.**5 |
6 |
Equivalent bore diameter O*5 |
<0.***5 |
Procedure:
1.Cut injection hose to required length **8m, elicit the template with connecting pipe and pipe both ends, draw outside of concrete to ******0mm; Hose(At least one end) embeded in concrete should bound with steel strongly.Plug installed on the ends to prevent impurities get into the injection pipe.Clip injection hose on even concrete surface each ******0mm when fixing it
2.Concrete covers to a thickness of at least *0mm
3.Hose cross position must contact the concrete tightly, outlets overlapping allowed.
4.Distance between two parallel injection pipe at least *0 mm.
Turn radius should no less than **0mm, no bending angle, not allowed to be bounded to rebar.
Execution standard: Q/TX LWS*******6
Storage:
Do not damage the package during transportation and storage.
Put in dry, ventilated place, avoid direct sunlight.
Prohibit from contacting acid, alkalis, oil, organic solvent etc., insulated from heat resource;
Keep in-house ,sealed and no pressure.
Shelf time of *2 month
Package: *0m or**0m/roll
Country: | China |
Model No: | - |
FOB Price: | 3.2 ~ 8 / Meter Get Latest Price |
Place of Origin: | China |
Price for Minimum Order: | 3.2 per Meter |
Minimum Order Quantity: | 500 Meter |
Packaging Detail: | carton |
Delivery Time: | 15-20 days |
Supplying Ability: | 100000 Meter per Week |
Payment Type: | T/T, Western Union |
Product Group : | - |