FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1
Packaging Detail:
-
Delivery Time:
3-5work days
Supplying Ability:
-
Payment Type:
-
Contact Person Ms. Niki
Zhong lou area, changzhou, jiangsu
***** diameter of tank:**0mm, inner diameter of tank:**5mm Material of Outer tank: SUS**4 stainless steel /Colourful steel / galvanized steel 2.Length of vacuum tube: 1.8M 3.Diameter of vacuum tube:*8MM 4.board :stainless steel **4 2B/stainless steel Thickness:0.4mm 5. board: stainless steel **4 2B, thickness 1.2mm 6.heat prservation layer : by polyurethane, thickness *5mm 7.bracket:galvanized , thickness 1.5mm/stainless steel , thickness 1.2mm 8vacuum tube : Transition heat-pipe tube( length:***0mm, diameter:*8mm, inside 0.5mm copper tube ) 9. Hail resistance: *5mm *0.pressure: 0.**0.8 Mpa