FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
Barcelona, Spain
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
-
Contact Person Mr. Victor
Joan Lluis Vives 49, Barcelona, Spain
Scaffolding specially designed for construction work and new building with greater working space and weight bearing capacity. It**9;s special design let**9;s you modify the height of the work, maintaining the optimum safety and stability requirements for the tip of work being done SYSTEM COMPONENTS - Frame Ext. ***0. - Side rail for ext. - Tie - Diagonal - Elevator with legs - Elevator with clamps Furthermore, the structure is combined with 2 and 3 meters module and composed of the following specific elements material common to the facade scaffolding: - 2 and 3 meter toe-board rail - 2 and 3 meter metal solid platforms - 2 and 3 meter wooden stairway platforms - Adjustable base plates - Locks - Pulley triangles - Stairways - Hook securing elements - Orthogonal clamps - Raw plugs and eye-bolts