Description
Steam
Turbine, Generator and Boiler are main three equipments in a
thermal power station. Steam or gas turbine is most typical machine
in machine building industry. It is a sophisticated machine, having
very high requirements for design, manufacture, installation,
adjustment and material, etc. Generator and turbine get together to
form a power generating set. So generator has almost same
requirements as turbine. As increasingly high requirement for
friendly environment, small power generating set gradually is
obsolete meanwhile power generating set is getting larger and
larger, for example, **0 MW, even ***0 MW. This brings about many
new difficulties. In other words, manufacturers are faced with new
challenges
. Spare parts are necessary
for any power station. As far as a large power station is
concerned, even stoppage one day will result in huge economic loss.
Therefore, how to purchase spare parts at relatively low price and
ensure premium quality and timely delivery of spare parts becomes a
important problem to run a power station.
We have an experienced working team. Some of them
are senior engineers of profound knowledge, who have had lots
of practice experience in respective technical fields. A part of
our staff members have ever participated in construction of
overseas power projects knowing about power equipment quite well.
Moreover we have wide business intercourse and close relation with
many of respective manufactures, especially with DEC and other
power equipment producers.
We can
provide customers with varies kind of spare parts, especially that
of DEC’s steam/gas turbines & generators, and other Chinese
generating sets. You may rest ensured that our products will be
relatively low in price, excellent in quality, and timely in
delivery.