FOB Price
Get Latest Price65000 / Set
|Minimum Order
Place of Origin:
Henan, China
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
Standard container or as your requirement
Delivery Time:
40~60 days to the Qingdao port after receiving the
Supplying Ability:
30 Set per Month
Payment Type:
L/C, T/T, Western Union
Contact Person Ms. katherine
Xingmi road, Zhengzhou, Henan
Copper, Gold, Lead, Zinc , Silver, iron ore Refinery processing Plant
Our company supply high quality
mineral processing equipment which is very popular both at home and
abroad.
I. mineral processing equipment
*- refinery processing
plant introduction
This
Ore beneficiation and upgrading line is very practical for small
and middle mine owner to upgrading the ore
grade.
II. Basic Process of raw ore beneficiation and upgrading plant
The
extracted ore should be crushed by jaw crusher initially.
When it gets the reasonable fineness, it is transported
into ball mill by elevating conveyer and feeder, and is
milled by ball mill. The subtle milled ore gets the next procedure:
classification.
There is a theory that if the weights of solid particles are
different, the sedimentations will be different, and the mixed ore
can be classified by screw classifier. The classified ore gets
into magnetic separator. Since the specific magnetization
coefficients of ores are different, the magnetic substance of mixed
ore is separated from others with magnetic and mechanical
force.
The mineral matter, which has been separated by magnetic separator
initially, is transported into flotation machine by, and
different medicines are added according to different
characteristics of ore, so that the needed ore is separated from
others. Since the separated ore are wet, they should be dewatered
by thickener initially, and dried by drier. Finally,
the dry minerals come into being.
III. Our
services
1.
Ore laboratory test
2.
Ore beneficiation test
3.
Flowchart designing and layout designing.
4.
Full set of machines
5.
Erecting and commissioning
6.
Training
7.
Technical consolation
8.
End products
selling