FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
-
South Korea
Contact Person Mr. Daehee
B 208 Hanyang Univ Total Technology Institute 17 , Hangdang dong, Seoul
-Specialized ballast installed
-Sensing with microwave correctly
-Keep lowest power when nobody
-Approx. 0.3sec of rising time
-Adj. delay time (*5, *0sec, 1, 2min)
-Program lowest power (*0~ *0%)
***- ballast controlled by *-sensor
-Simple wiring for group control