Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally.
Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Spent Solvent Recovery

Spent Solvent Recovery

FOB Price

Get Latest Price

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

-

Packaging Detail:

-

Delivery Time:

-

Supplying Ability:

-

Payment Type:

-

Contact Now
Free Member

Contact Person Ms. Innovative

435,Patel Avenue, Nr. Gurudwara,Thaltej,, Ahmedabad, Gujarat-India.

Contact Now

Description

**0LTR

Special Features Solvent recovery unit for photopolymer flexo plates.
 
A. General description:
This is designed for recovery of flexographic photopolymer plate solvent washout chemical and any environmental green chemical with specialties of distilling and cooling can be connected with in-line processor and any plate washout machine directly. With cold air circulation and drain out of residue for high speed recovery. Super recovering rate in the shortest time, is an ideal and high efficient recovery unit for flexographer.
 
B. Technical information:
Recovery volume: **0 liters
Power consume: **0V AC 6.*5KW
Diathermic oil: *0 KG
Machine dimension: Main body: ***0x **0×***0 mm
Recovery rate: *5%
Recovery time: 3 ~ 4 hours

 
C. Operating steps:
1. After opening the crate, plug in **0 V power, and connect the ground (earth).
2. Open the lid and fill the tank up to the level with solvent to be recovered (**0 L)
3. Close the lid and tighten it.
4. Check all the pipe / hose make sure it is well connected. Especially vacuum pipe (6) and fresh come-out pipe (1).
5. set up the thermostat (*8) for example for Perc. Is **0 degree C, for green chemical is ******0 degree C. Vacuum tank pressure (3) high at 0.*3 Mpa / low at 6.*1Mpa, and steam cooling fan thermostat (*1) at *0 degree C.
6. Turn on the power switch (*5), steam cooling switch (*6), heater switch (*7) and vacuum pump switch (*2).
7. If you want to be controlled with timer, it depends on the quantity of the chemical, set up the timer (*4) then turn on the switch (*3).

 
D. Important:
1. Install the unit in a wide and ventilated place.
2. Disconnect electric power before doing any action.
3. No taking off the control panel
4. Change the diathermic oil every ***0 working hours.
5. No filling the solvent container up over the level (**0 liters)
6. Remove the waste after every recovery process

 

Send a direct inquiry to this supplier

To:

Ms. Innovative < Innovative Flexotech >

I want to know: