Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally.
Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
double-rail hoist trolley

double-rail hoist trolley

FOB Price

Get Latest Price

5500 ~ 35000 / Unit

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

Minimum Order Quantity:

1 Unit

Packaging Detail:

Firm wooden case or crates and plywood cases for long-way transportation and storage

Delivery Time:

20 days~ 40 days

Supplying Ability:

100 Unit per Week

Payment Type:

T/T, Western Union

Contact Now
Free Member

Contact Person Mr. Bruce

Industrial Park, Changyuan County, Henan

Contact Now

Description

Double-rail hoist trolley 

Double-rail hoist trolley  is used on double girder overhead crane or bridge crane for all industry material handling. It travels on two rail on cranes. 
 
Specifications :

Capacity : from 0.5 T to *2t
Lift height: 3m to 60 m
Working duty: A3, A4,A5.
CE, TUV, GOST certificate, Top quality  
 
Features & advantages:

· 1. Reasonable structure, light dead weight
· 2. Favorable performance, accurate and smooth lifting.
· 3. Safe and reliable traveling
· 4. Low noise, easy operation,  
· 5. Convenient maintenance, high exchangeability for parts and components 
 
 
 General parameter:
  

lifing capacity (t)             1t~*0t              *6t~*2
lifting height  (m)             3m~*0m               3m~*0m
lifting speed  (m/min)        8m/min(0.8m/min)      3.5m/min(0.*5m/min
travel speed  (m/min)             *0 or *0               *0 or *0
working duty                 A3,A4,A5                   A3,A4,A5
 
 
Electric  hoist working Conditions:
 
1. Working temperature: ***-**0 degree
2. Work moisture: <*5%
3. No fire, no explosive goods, no corrosion medium.
4. Forbidden to lift melting metal, poisonous, explosive, flammable goods. The working duty is medium, when the working duty is level up, the rated lift capacity should be reduced accordingly (*0% per level).
 

Send a direct inquiry to this supplier

To:

Mr. Bruce < Henan Weihua Heavy Machinery Co.Ltd >

I want to know: