Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally.
Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Petroleum Machinery Equipment Part Hydraulic Power Pliers

Petroleum Machinery Equipment Part Hydraulic Power Pliers

FOB Price

Get Latest Price

1000 ~ 100000 / Set ( Negotiable )

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

Minimum Order Quantity:

1 Set

Packaging Detail:

wooden box or iron case or as required from clients

Delivery Time:

15-35 days

Supplying Ability:

50 Set per Month

Payment Type:

T/T, L/C, Western Union, Money Gram, PayPal

Contact Now
Free Member

Contact Person Ms. Linda

Shanghai Road, Yancheng, Jiangsu

Contact Now

Description

Petroleum Machinery Equipment Part Hydraulic Power Pliers


Application:



XQ**0/*2Y Hydraulic power tong


XQ*40/*2YA open-style hydraulic power tong is applied for making-up and breaking-out  *3/8" ,*3½"drill pipe,  2 7/8"*4½" tubing and 4½"*5½" casing in the oil field workover operations. 

Products features: 


1 The main tong is driven by a high torque hydraulic motor ,rack plunger drives backup tong ,simple transmission ,compact structure. 



2 The main and backup tong equip with the curved roller climbing type gripping device .It performs reliable while working .



3 Tong head setting with the guide device ensure a stable of rotating and long life service .



4 By operating the manual reversing valve can realize the main tong and backup clamping string  or release concurrently .



5 Friction braking device is setting in tong head , it is convenient for adjusting and maintenance 



6 Manual reversing valve matching with reset knob performs more convenient and flexible.



7 Equipped with automatic  retractable security door to ensure the safety while under working .











Model



XQ**0/*2YA



Pipe Size  Range of Master Tong



2 3/8"*3½"Drill Pipe  , 



2 7/8"- 4½" Tubing ,  



 4½"*5½"Casing



Pipe Size  Range of Backup Tong



2 3/8"*3½"Drill Pipe  , 



2 7/8"- 4½" Tubing ,   



4½"*5½"Casing



High Gear Rated Torque



2.6 kN.m  (***8 ft-lbs)  



Low Gear Rated Torque



 *2 kN.m  (***1ft-lbs)



High Gear Rated Speed



*2r/min



Low Gear Rated Speed 



*4r/min



Rated Operation Pressure



*2MPa(***0psi)



Max. Flow



**0L/min (*2gpm )



Dimension:L×W×H (mm)



    ***4×**2×**9mm



       (*0.3"×*2.9"×*3")



Removed Quality(including Backup tong)



**0KG







 

Send a direct inquiry to this supplier

To:

Ms. Linda < Jiangsu Eson Machinery Co., Ltd >

I want to know: