Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally.
Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Aluminum formwork system

Aluminum formwork system

FOB Price

Get Latest Price

150 ~ 250 / Square Meter

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

Minimum Order Quantity:

2000 Square Meter

Packaging Detail:

as customer's request

Delivery Time:

-

Supplying Ability:

-

Payment Type:

T/T, L/C

Contact Now
Free Member

Contact Person Ms. Bella

Shijiazhuang, Hebei

Contact Now

Description

Introduction of Aluminum Template System
Boyang aluminum alloy construction template system is processed with integrated extruded aluminum profiles and stands as a new generation of green construction technology. The said system is mainly consisted of template system, support system, fastening system and accessory system and can be extensively applied in various fields of reinforced concrete construction structure. The entire system is of high standardization, lightweight, strong bearing capacity, high matching accuracy, disassembly convenience, large plate surface, less joints, good stability, long service life, more circulation times, recyclability, good economic benefits and high recovery value. With the said system, the construction site is safe and clean, mechanical equipment is unnecessary for coordination in the process of construction, the construction period is short, there is no construction waste or noise pollution generated and the surface is even and smooth after concrete pouring, in addition to conformity to national policies of low carbon and emission reduction.

Material ****-T6  ****-T6
Bearing capacity:*0KN/m2
Weight:****0kg/m2
Hardness:about *3webster
Color:silver white
Surface: coated by isolation layer

Four Major Aluminum Template Systems
Template System:
To constitute the closed surface desired for concrete structure construction and ensure the forming of construction structure in concrete pouring.
Accessory System:
To connect single pieces of templates into a whole system, as connecting template member.
Support System:
To play a supporting role in the process of concrete structure construction and ensure floors, beam bottoms and cantilevered structures to be held steadily.
Fastening System:
To guarantee the width dimensions of structured formed by templates and ensure no template deformation, expansion or explosion in the process of concrete pouring.

Products details
1. total system forms the complete concrete structure
2. convenient
3. easy operation
4. high quality
5. light and great flexibitity
6. durable, made of special alloy aluminum
7. no need for rehabilitation, no risk of rust and corrosion
8. fast installation owing to its special design
9. speed of construction**-days each floor construction cycle.
*0. Formwork can be re-used over **0 times.
*1. No tower cranes required to lift the formwork from floor to floor, as the formwork is lightweight.

System Characteristics
System Characteristicshigh standardization, lightweight, strong bearing capacity, high matching accuracy, disassembly convenience, large plate surface, less joints, good stability, long service life, more circulation times, recyclability, good economic benefits and high recovery value. 

Analysis on Standard Five-day Construction Period
1) Day 1:Measure, lay off, bundle wall rebars and complete water and electricity performing and embedding
2) *7:****2:*0 in Day 2:Remove wall boards of lower level and transfer to the upper level for installation of wall column template
3) *4:*0 in Day 2 - *8:*0 in Day 3:Remove wall boards of lower level and transfer to the upper level for installation
4) *7:****5:*0 in Day 4:Bundle beam rebars, erect cantilevered structures for template construction, and adjust and strengthen wall column templates
5) *5:*0 in Day 4 - *5:*0 in Day 5:Bundle floor slab rebars and alternate water and electricity performing and embedding
6) *5:****7:*0 in Day 5:Clean the floor, recheck dimensions and prepare for concrete pouring
7) *7:****3:*0 in Day 5:Concrete pouring

Analysis on Standard Five-day Construction Period
1) Day 1:Measure, lay off, bundle wall rebars and complete water and electricity performing and embedding
2) *7:****2:*0 in Day 2:Remove wall boards of lower level and transfer to the upper level for installation of wall column template
3) *4:*0 in Day 2 - *8:*0 in Day 3:Remove wall boards of lower level and transfer to the upper level for installation
4) *7:****5:*0 in Day 4:Bundle beam rebars, erect cantilevered structures for template construction, and adjust and strengthen wall column templates
5) *5:*0 in Day 4 - *5:*0 in Day 5:Bundle floor slab rebars and alternate water and electricity performing and embedding
6) *5:****7:*0 in Day 5:Clean the floor, recheck dimensions and prepare for concrete pouring
7) *7:****3:*0 in Day 5:Concrete pouring

 

Send a direct inquiry to this supplier

To:

Ms. Bella < Hebei Byang Hardware Co.,LTD >

I want to know: