Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally.
Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
A ladle steelmaking technology in the end
Prev
A ladle steelmaking technology in the end
Next

A ladle steelmaking technology in the end

FOB Price

Get Latest Price

|

- Minimum Order

Country:

China

Model No:

30-100t

FOB Price:

Get Latest Price

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

-

Packaging Detail:

-

Delivery Time:

-

Supplying Ability:

-

Payment Type:

T/T, L/C

Product Group :

-

Contact Now
Free Member

Contact Person Mr. junqiang

Huaian, Jiangsu

Contact Now

Product Specification

Product Description

A package in the end, "the main technical characteristics of molten iron transportation technology
Able to meet the circumstances of the production of hot metal cars, roadbed, track, turnouts, transportation and production organizations, and wireless remote control locomotives to carry out a detailed analysis, especially online desulfurization, dephosphorization, desilication process in the ladle into the melt shop directly in the molten iron bag desulfurization, dephosphorization, desilication, reducing production processes.
Therefore, the use of blast furnace hot metal ladle and steelmaking ladle shared a package in the end "technology, will undertake the blast furnace hot metal, hot metal transport, molten iron pretreatment feature set as a whole, compared with conventional torpedoes tanker transport, the innovation is as follows:
 eliminating the need for hot metal pour pot operation process, streamline production operations, shorten the process; enable steelmaking plant layout is compact and reasonable, compared with the mixed iron car down tank, reducing the the steelworks room covers an area of ​​about ***0m2. Reduce the large overhead traveling crane lifting distance, and speed up production of rhythm;
 to reduce a mixed iron car, to avoid the loss of the process of molten iron and hot metal temperature loss to the unfortunate process of ladle injection of iron in the inverted tank station, saving the energy consumption of the iron injection process, double steel-making conducive to dephosphorization The furnace eat scrap and ore.
 a package in the end "of hot metal transport technology, you can avoid the torpedo car in the inverted tank station to the unfortunate process of ladle injection of iron dust pollution in accordance with the other steel mills down the dust amount of the tank station, reducing soot volume *****0m3 / h per year to reduce soot emissions by about ***0t, the basic graphite within the steel plant fly ash pollution, environmental benefits, the steel plant cleaner production.
due to the cancellation of the cross***0t casting owners hook lifting hot metal down the tank pit lifting the ladle, the steel plant room feeding lifting can reduce the height of about *0m, and shorten the transporting time, accelerate the rhythm of production.
 "a package in the end instead of torpedo transport molten iron, not only can reduce the inverted tank station once construction investment, while reducing production and operating costs.
 from the transport equipment (Torpedo, inverted cans Station and is no ladle, using a unified point of view of the ladle), up **0t torpedo tankers, reduced by at least *0 of the ladle, saving about *0 million yuan of investment.

Country: China
Model No: 30-100t
FOB Price: Get Latest Price
Place of Origin: -
Price for Minimum Order: -
Minimum Order Quantity: -
Packaging Detail: -
Delivery Time: -
Supplying Ability: -
Payment Type: T/T, L/C
Product Group : -

Send a direct inquiry to this supplier

To:

Mr. junqiang < The Huaian zhongcheng Metallurgical Engineering Technology Co., Ltd. >

I want to know: