FOB Price
Get Latest Price2100 ~ 2500 / Ton ( Negotiable )
|12 Minimum Order
Country:
China
Model No:
-
FOB Price:
2100 ~ 2500 / Ton ( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
2100 per Ton
Minimum Order Quantity:
12
Packaging Detail:
Standard seaworthy packing and according to order.
Delivery Time:
Within 45 days
Supplying Ability:
2000 Ton per Month
Payment Type:
T/T, L/C
Product Group :
Contact Person Mr. Aaron
Lingcheng Industrial Park, Daye City, Huangshi, Hubei
H*1 Hot Work Tool Steel is a 5% chromium hot work steel that is characterized by excellent impact toughness.
> It contains less vanadium than the
widely-used H*3 hot work tool steel. This provides for the higher
toughness, with some reduction in wear resistance and temper
resistance.
> H*1 hot work tool steel is a
deep-hardening, air-hardening steel that exhibits minimal size
change during heat treatment.
> It has good resistance to thermal
fatigue cracking (heat checking) and excellent resistance to gross
cracking and thermal shock when water cooled in
service.
Heat Treatment:
Forge: at ***0℃****5℃ Cool slowly and anneal then.
Annealing: at **3℃***8℃ Cool slowly in furnace
Stress Relieving: heat slowly to ******6℃, and then cool in still
air.
Hardening: Preheat to **5℃ and then heat to ***0℃ and hold for *5
to *0 minutes. Air cool (air quench)
APPLICATIONS: H*1 hot
work tool steel is recommended for hot tooling applications where
maximum resistance to cracking is required. Such applications
include hot punches, die casting dies, forging dies, hot shear
blades, hot gripper dies, and extrusion tooling.
C | 0.***0.*1 |
Si | 0.***1.*0 |
Mn | 0.***0.*0 |
P | max.0.**5 |
S | max. 0.**5 |
Cr | 4.***5.*0 |
Mo | 1.***1.*0 |
V | 0.***0.*0 |
Cu | max. 0.**5 |
TYPE | A | B | C | D |
THIN | 0.**2.0 | 0.**2.0 | 0.**2.0 | 0.**2.0 |
THICK | 0.**2.0 | 0.**2.0 | 0.**2.0 | 0.**2.0 |
Country: | China |
Model No: | - |
FOB Price: | 2100 ~ 2500 / Ton ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 2100 per Ton |
Minimum Order Quantity: | 12 |
Packaging Detail: | Standard seaworthy packing and according to order. |
Delivery Time: | Within 45 days |
Supplying Ability: | 2000 Ton per Month |
Payment Type: | T/T, L/C |
Product Group : | Hot work tool steel |