FOB Price
Get Latest Price900 ~ 1200 / Ton ( Negotiable )
|12 Minimum Order
Country:
China
Model No:
-
FOB Price:
900 ~ 1200 / Ton ( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
900 per Ton
Minimum Order Quantity:
12
Packaging Detail:
Standard seaworthy packing and according to order
Delivery Time:
Within 45 days
Supplying Ability:
2000 Ton per Month
Payment Type:
T/T, L/C
Product Group :
Contact Person Mr. Aaron
Lingcheng Industrial Park, Daye City, Huangshi, Hubei
Alloy Structural Steel AISI ***0 is a chromium molybdenum alloy steel that is supplied in either the annealed or prehardened condition, it can be used as a holder material for high strength structural components.
> Weldability suffers with
increasing chromium content.
> High temperature strength
and high pressure hydrogenation perperties are promoted by chromium
and molybdenum.
> Molybdenum significantly
reduces temper brittleness.
Heat
Treatment:
Forge: at ***0°C****0°C Cool slowly and anneal immediatedly
Anneal: at **0°C***0°C Cool slowly in furnace
Stress Relieve: at to **0°C***0°C Cool in still air
Harden: Preheat at **0°C***0°C raise to **0°C***0°C Cool in air,
iol or into salt bath held at **0°C***0°C and then air
cool
APPLICATIONS: Used for
shafts, gears, cylinders and columns for industry mechanics in
general.
Construction of mold, make large-medium plastic mold.
For compression molds where the etching is not required.
Mechanical parts in general.
Chemical Composition(%):
C | 0.***0.*5 |
Si | 0.***0.*7 |
Mn | 0.***0.*0 |
P | max.0.**5 |
S | max.0.**5 |
Cr | 0.***1.*0 |
Mo | 0.***0.*5 |
Ni | max.0.**0 |
Al | - |
Cu | max. 0.**0 |
TYPE | A | B | C | D |
THIN | 0.**2.0 | 0.**2.0 | 0.**2.0 | 0.**2.0 |
THICK | 0.**2.0 | 0.**2.0 | 0.**2.0 | 0.**2.0 |
Country: | China |
Model No: | - |
FOB Price: | 900 ~ 1200 / Ton ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 900 per Ton |
Minimum Order Quantity: | 12 |
Packaging Detail: | Standard seaworthy packing and according to order |
Delivery Time: | Within 45 days |
Supplying Ability: | 2000 Ton per Month |
Payment Type: | T/T, L/C |
Product Group : | alloy steel |