Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 11 Million Importers & Exporters globally. Join Now |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Next

Iron ore Mining

FOB Price

Get Latest Price

|

- Minimum Order

Country:

Malaysia

Model No:

Fe 62%

FOB Price:

Get Latest Price

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

-

Packaging Detail:

-

Delivery Time:

-

Supplying Ability:

-

Payment Type:

-

Product Group :

-

Contact Now
Free Member

Contact Person Mr. KARU

14, Jalan KE 1/3, Kota Emerald, Rawang, Selangor

Contact Now

Product Specification

Product Description

We have here is approximately *2,**0 acres of iron ore mine land. We are not expecting one investor to take up the entire land but at least a minimum of 1,**0 acres. We have 2 nearby ports for logistic purpose. Interested investors have to do their own exploration in the land that we will provide.

1. For 1,**0 acres, estimated deposit is around *0 million metric tonnes to **0 million metric tonnes and its going to be surface mining.

2. Estimated grade is around *7 to *2.

3. Expecting a JV venture, where we will come out with the land and the investor to come out with the financial investment to operate the mine. The proposed JV share ratio will be *1% for the investor and *9% for the state government.

4. If the investor is not keen for JV, they can operate the iron ore mine by themselves **0% but some sort of profit sharing have to be agreed which is subject to negotiation.

5. The Geologist or COA ( Certificate of Analysis ) report is not available for the land as its still a virgin land with iron ore deposits. I sincerely advice you to bring your own geologist and do your own exploration to get a genuine result.

6. For 1,**0 acres, the initial exploration work where rental of machinery needed and that will cost you approximately RM**0k to RM**0K. Secondly, approximately RM*0 million to RM*5 million over a period of 3 to 6 months during mining operation depending on the size of the operation. You will get a break even after a maximum of 7 to *0 months with a minimum production of *0k metrics ton per month.

7. This is just a summary but document evidence will be presented in the meeting session if the investor is really keen to proceed. The documents are confidential in nature hence we will arrange a meeting session to table it.

Country: Malaysia
Model No: Fe 62%
FOB Price: Get Latest Price
Place of Origin: -
Price for Minimum Order: -
Minimum Order Quantity: -
Packaging Detail: -
Delivery Time: -
Supplying Ability: -
Payment Type: -
Product Group : -

Related Products CHITTAL TRADERS

Send a direct inquiry to this supplier

To:

Mr. KARU < CHITTAL TRADERS >

I want to know: