Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 11 Million Importers & Exporters globally. Join Now |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
KARONAT-plaster of paris
Next

KARONAT-plaster of paris

FOB Price

Get Latest Price

|

500 Ton Minimum Order

Country:

Turkey

Model No:

-

FOB Price:

Get Latest Price

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

500 Ton

Packaging Detail:

-

Delivery Time:

-

Supplying Ability:

-

Payment Type:

-

Product Group :

-

Contact Now

ONAT GYPS

Turkey

Free Member

Contact Person Mr. Fuat

TURGUT OZAL BULVARI NO:6, ANKARA, Other

Contact Now

Product Description

The Surface and the Setting to be Applied
- It should be free of dirty material such as dust, oil and paint.
- The surfaces such as extremely dry, hot and highly absorbent should be moisturized with water. 
- The surface of the ceilings should be roughened before applying the plaster or undercoated with a material to ensure attachment of the mortar. 
- It should be paid attention that there is no air current and air circulation at the atmosphere during application. 
- The application temperature should be between *5 and **0 ˚C.
Application
6,**7 liters of water is poured down into the mixture bowl; Karanot Moulding Plaster is added sprinkling into the water. It is awaited for a period of approximately **3 minutes in order to cause the plaster to absorb the water. It is mixed with a hand mixer or with the help of a trowel in order to obtain a homogenous mixture. The prepared mortar is poured into the formwork prepared and lubed before. After pouring a layer, a layer of fiber or hemp is laid on that layer of plaster in order to make the mould more flexible and strong. Another layer of plaster is poured down of the laid fiber or hemp. The plaster poured down into the mold will start to warm after a while. The plaster first warmed and then cooled will let itself go after a while. The plaster taken out of the mould is left at the room temperature to dry before mounting.
Packaging
Polypropylene bags of *0 kg ( ± 2 %)
Storage
At most *0 bags should be stockpiled one on another at a dry place; the bags must not be in contact with the floor and they must be stored protected from humidity and condensation. They must be used within 9 months after production date.

Country: Turkey
Model No: -
FOB Price: Get Latest Price
Place of Origin: -
Price for Minimum Order: -
Minimum Order Quantity: 500 Ton
Packaging Detail: -
Delivery Time: -
Supplying Ability: -
Payment Type: -
Product Group : -

Send a direct inquiry to this supplier

To:

Mr. Fuat < ONAT GYPS >

I want to know: