FOB Price
Get Latest Price( Negotiable )
|200 Set Minimum Order
Country:
China
Model No:
-
FOB Price:
( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
200 Set
Packaging Detail:
one set in one iron box and then into a carton box, then ten sets into a carton.
Delivery Time:
15-20days after getting 30%TT
Supplying Ability:
1000 Set per Day
Payment Type:
T/T
Product Group :
-
Contact Person vivian
Shaoxing, Zhejiang
Place the welding machine on the stander, chose die head according to pipe’s diameter, and fix it on the machine. In regular, the samall end is at the front, the bigger end at the back.
2. Power on
Power on (make sure the power should be with leakage current protector) , the grren light and the red light on, wait till the red light off and keep greenlight on, which indicateds the machine enter into auto temperature control mode and the machine can be uesd.
Note: during the auto temperature control mode, the red and the green light will be on and off alternatively, this indicateds that the machine is under control and it will not affect operating.
3. Fusion pipes
Using cutter to cut pipe vertically, push the pipe and fitting into die head withouot any rotation. Take them off immediately when heating time reached (see the table below) and insert
OD(mm) |
Depth(mm) |
Heating time (s) |
Cooling time (s) |
*0 |
*4 |
5 |
3 |
*5 |
*6 |
7 |
3 |
*2 |
*8.1 |
8 |
4 |
*0 |
*0.5 |
*2 |
4 |
*0 |
*3.5 |
*8 |
6 |
*3 |
*7.4 |
*4 |
6 |
*5 |
*2 |
*0 |
8 |
*0 |
*5.5 |
*0 |
8 |
**0 |
*1.5 |
*0 |
*0 |
Country: | China |
Model No: | - |
FOB Price: | ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | 200 Set |
Packaging Detail: | one set in one iron box and then into a carton box, then ten sets into a carton. |
Delivery Time: | 15-20days after getting 30%TT |
Supplying Ability: | 1000 Set per Day |
Payment Type: | T/T |
Product Group : | - |