FOB Price
Get Latest Price1 ~ 20000 USD / Set ( Negotiable )
|1 Set Minimum Order
Country:
China
Model No:
-
FOB Price:
1 ~ 20000 USD / Set ( Negotiable )Get Latest Price
Place of Origin:
China
Price for Minimum Order:
1 per Set
Minimum Order Quantity:
1 Set
Packaging Detail:
Exported standard wrapped with aluminum film and fixed pallet tray
Delivery Time:
Be ready for dispatch within 15 working days since
Supplying Ability:
20 Set per Month
Payment Type:
T/T, Western Union
Product Group :
Contact Person Ms. Amy
1203-106 Room, Economical Development Zone, International Building, Bazhou, Langfang City, Hebei Pro, Langfang, Hebei
Tremie pipes are normally used to pour concrete into a drilled
pile, after the steel cage reinforcement is placed in
operation, to avoid concrete pile breakage or gaps.
During the operations they are lowered inside and through the
steel cage reinforcement to protect concrete from soil
contamination water filtering and to avoid any possible
concrete quality corruption.
KR drill tremie pipes are made of quality drawn steel plates
in order to guarantee high resistance
Pipes sections can be connected by two kinds of coupling systems: threaded joints and wire cable joints.
Country: | China |
Model No: | - |
FOB Price: | 1 ~ 20000 / Set ( Negotiable ) Get Latest Price |
Place of Origin: | China |
Price for Minimum Order: | 1 per Set |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | Exported standard wrapped with aluminum film and fixed pallet tray |
Delivery Time: | Be ready for dispatch within 15 working days since |
Supplying Ability: | 20 Set per Month |
Payment Type: | T/T, Western Union |
Product Group : | Drilling tools |