Product Description
U*1 base skim coat is a good cushion for the compressive stress
between different wall surfaces. It applies on leveling both
interior and exterior cement or concrete surfaces which is ragged
so that to reduce the usage of top coat and project cost. Features
1. Applied as a base layer prepared for top coat 2. Low
maintenance, economical 3. Impervious to termites 4. Good bonding
to substrates 5. Moisture and mould resistant 6. Cost effective 7.
Non-toxic Surface preparation The solid substrate should be clean,
dry and free of oil, grease, wax, latex compounds, curing
compounds, dust and all foreign matter. Application 1.With right
amount clear water (approximately 3.3:1) furnishing clay shape
2.According to its, first pours into the clear water stirs in the
feeding trough, then joins the powder material, then stirs the even
non- pellet paste with the electrically operated mixer to stick the
shape, settles several minutes slightly to do again stirs, the
effect is better 3. Evenly spreads with the putty the glue wipes in
the basic plane, its thickness control in 1.5~ 2mm 4. After *4
hours do solidly, only then carry on the surface layer putty the
construction. 5. Do not add water into the cured putty and reuse
it. Precautions 1. It should not be directly applied on gypsum
plaster, metal, rubber, PVC, wooden, earth based chip plate, gas
concrete, and under floor heating, painted or tiled surfaces.
Contact with the company for other solutions. 2. Avoid the use of
excessive moisture during application. 3. Do not apply on concrete
surfaces before 7 days set-time. 4. Do not work below 5 degree or
below *0 degree. 5. On interior application, openings in the
building (windows, doors, ect.) should be covered to avoid
excessive wind which could cause premature dry-out. Coverage:
**5kg/m2 Color: grey/ white Remark Main ingredient: concrete
polymer, hydrophobic Package: *5kg/bag Package: *5kg/bag Storage:
shelf life is minimum 1 year when stored in covered and dry
environment.
Country: |
China |
Model No: |
U01
|
FOB Price: |
(Negotiable)
Get Latest Price
|
Place of Origin: |
CHINA |
Price for Minimum Order: |
- |
Minimum Order Quantity: |
1TON |
Packaging Detail: |
- |
Delivery Time: |
3-5 DAYS |
Supplying Ability: |
500TON/DAY |
Payment Type: |
- |
Product Group : |
- |