Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally.
Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Adjustable Engineered Formwork System With Stair Shaft
Next

Adjustable Engineered Formwork System With Stair Shaft

FOB Price

Get Latest Price

|

- Minimum Order

Country:

China

Model No:

Engineered Formwork

FOB Price:

Get Latest Price

Place of Origin:

China

Price for Minimum Order:

-

Minimum Order Quantity:

-

Packaging Detail:

In bulk, assembly on site according to assembly drawing

Delivery Time:

After deposit 15-20 days

Supplying Ability:

-

Payment Type:

T/T, L/C

Product Group :

Contact Now
Free Member

Contact Person Mark

cangzhou east development zone, Cangzhou, Hebei

Contact Now

Product Description

Adjustable Formwork Platform System With Stair Shaft ISO***1 - ***8


Description:

 Brief introduction

  As operating platform, the shaft platform is mainly used in the concrete pouring of elevator shaft, equipment shaft, stair shaft of high-rise building etc.

Competitive advantage
 
①.The length of shaft beam is adjustable. Lmin=***0, Lmax=***0.
②.Flexible structure makes lifting easier.
 

Country: China
Model No: Engineered Formwork
FOB Price: Get Latest Price
Place of Origin: China
Price for Minimum Order: -
Minimum Order Quantity: -
Packaging Detail: In bulk, assembly on site according to assembly drawing
Delivery Time: After deposit 15-20 days
Supplying Ability: -
Payment Type: T/T, L/C
Product Group : engineered formwork

Send a direct inquiry to this supplier

To:

Mark < CCCC FWK INTERNATIONAL FORMWORK CORPORATION >

I want to know: