Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally.
Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
H20 Timber Beam Formwork  Concrete Column Formwork
Next

H20 Timber Beam Formwork Concrete Column Formwork

FOB Price

Get Latest Price

|

- Minimum Order

Country:

China

Model No:

TBC system-A

FOB Price:

Get Latest Price

Place of Origin:

China

Price for Minimum Order:

-

Minimum Order Quantity:

-

Packaging Detail:

In bulk, assembly on site according to assembly drawing

Delivery Time:

After deposit 15-20 days

Supplying Ability:

-

Payment Type:

T/T, L/C

Product Group :

Contact Now
Free Member

Contact Person Mark

cangzhou east development zone, Cangzhou, Hebei

Contact Now

Product Description

Detailed Product Description

 

 
Light weight Formwork

high bearing capacity Formwork

Rectangle Concrete Column Formwork

Square Concrete Column Formwork



H*0 Timber Beam Formwork for Rectangle, Square Concrete Column Formwork


Description:

1. Structure sketch


TBC system-A is a kind of formwork for pouring square or rectangle column, it is composed of four pieces of Tim-formwork, yoke, tie rod, wing nut, etc.

It will be designed according to column’s size; the formwork’s dimension is not adjustable.


Competitive Advantage:

1. Prefabricated connection, convenient and efficient.


2. Light weight but high bearing capacity.

For conventional design, its load bearing capacity is *0KN/m2 with weight of ****5kg/m2.
If required, the formwork can be specially designed for higher concrete pressures.

3. Timber is easy resized, so the Tim-formwork is relatively easier to change self’s size and shape. This approved formwork’s economical efficiency.




 

Country: China
Model No: TBC system-A
FOB Price: Get Latest Price
Place of Origin: China
Price for Minimum Order: -
Minimum Order Quantity: -
Packaging Detail: In bulk, assembly on site according to assembly drawing
Delivery Time: After deposit 15-20 days
Supplying Ability: -
Payment Type: T/T, L/C
Product Group : Column formwork

Send a direct inquiry to this supplier

To:

Mark < CCCC FWK INTERNATIONAL FORMWORK CORPORATION >

I want to know: