FOB Price
Get Latest Price|
- Minimum Order
Country:
China
Model No:
birdge formwork
FOB Price:
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
In bulk, assembly on site according to assembly drawing
Delivery Time:
After deposit 15-20 days
Supplying Ability:
-
Payment Type:
T/T, L/C
Product Group :
Contact Person Mark
cangzhou east development zone, Cangzhou, Hebei
High
Construction Bridge Formwork For Bridge Deck
Construction
Description:
1. Brief introduction
GTF system is a kind of compositional formwork system, it is
especially for the bridge deck construction. GTF is composed of two
sub system: formwork system and traveling
machine.
2. Competitive
advantage
①.High construction efficiency
The formwork system is easily to assembling, in the procedure of
construction, crane is not depended. The movement of formwork is
achieved by traveling machine.
②. Good safety performance
The formwork system is not needed to dismantle and move by
auxiliary tool or machine, and there are all-around operation
platforms, all this makes GTF system in good safety
performance.
Country: | China |
Model No: | birdge formwork |
FOB Price: | Get Latest Price |
Place of Origin: | China |
Price for Minimum Order: | - |
Minimum Order Quantity: | - |
Packaging Detail: | In bulk, assembly on site according to assembly drawing |
Delivery Time: | After deposit 15-20 days |
Supplying Ability: | - |
Payment Type: | T/T, L/C |
Product Group : | birdge formwork |